Injection Molding Machine Chapter 4
V3.0
4-56
D
) Press manual injection key
to perform injection operation.
E
) Press manual charge key
(One Touch)
,
starts charging to setting position.
F
) Press manual suck back key
to perform suck back operation.
G
) Press manual carriage retract key
to perform carriage retract operation.
H
) Press manual clamp open key
until clamp open is completed.
I
) Press manual ejector advance key
to perform ejector advance operation.
J
) Press manual ejector retract key to perform ejector retract operation.
4.2 Semi automatic operation
After
completion of manual operation
,
open front operator gate
,
do the following semi-auto operation
procedures:
A
) On clamp close screen
,
set
INTERVAL T.
properly.
B
) On charge screen set
CHA. END
position to 0. (Refer to following figure)
C
) On charge screen set
SUCK B.
position properly. (Refer to following figure)
D
) Press semi-auto key
.
E
) Close front operator gate
,
press and manual clamp close key
(One Touch).
F
) Upon end of cycle
,
open front operator gate
,
then close it again
,
and press and release manual
clamp close key
again(One Touch)
,
machine will perform next cycle.
PTmm
Pbar
V%
V1: 0/ 0
0/ 0
V2:
0/ 0
P1: 0/ 0
P2:
100.0mm
50.0mm
110.0mm
1.0mm
ACTION STATUS
M:
03D05M07Y
10h2510s
20°C
3W
SUCK BACK
COOLING T.
ON
< 20.0> 0.0
CHARGE MONITOR T.
CHARGE DELAY T.
PROFILE
F2
F1
F3
F4
F5
F6
F7
F8
MENU
05
2
1
BPbar
CH. END
0.0
SUCK B.
F.W. END
B.W. END
< 15.0> 0.0
< 0.2> 0.0
INJ END
1
2
3
10.0
0.0
0.0
100
100
100
0
0
0
V%
Pbar
PTmm
50
50
50
+100.0
50
40
150.0
80
70
70
70
30.0
10.0
80
10
B.P.
PURGE
AUTO
CHANGE
LOG
MOLD
SUPPORT
FUNCTION
PROD.
MANAG.
WGT. g
60.0
CARRIAGE
B.P ACT 0
RPM 0
SUCK
BACK
CHARGE
PARAMETER
Screen 4-39
Summary of Contents for TMC 1000E
Page 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Page 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Page 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Page 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Page 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Page 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Page 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Page 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Page 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Page 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Page 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Page 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Page 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Page 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Page 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...