Injection Molding Machine Chapter 4
V3.0
4-28
2.13 Charge/Carriage parameters
On CHARGE screen press F2 CHARGE PARAMETER or use the direction key in the main
menu screen to move the cursor to CHARGE PAR
,
press ENTER to display this screen.
10h25m10s
20°C
CARRIAGE MOVEMENT
SUCK BACK BEFORE OPEN
SUCK BACK AFTER CHARGE
SUCK BACK BEFORE CHARGE
CHARGE ONE TOUCH
03D05M07Y
F2
F1
P/V
MENU
01
RAMP
E
H
G
F
INTRUSION
CHARGE ON FLY
INTRUSION T.
D
C
A
B
3W
SUPPORT
MOLD
F3
F4
AUTO
B.P.
PURGE
PROFILE
F5
F6
CHANGE
LOG
MANAG.
PROD.
F7
F8
FUNCTION
100.0mm
100.0mm
CARRIAGE MONITOR T.
CARRIAGE HOLD T.
0.0
OFF
OFF
OFF
< 5.0>
OFF
OFF
CHARGE SECTION
L
K
ACTION STATUS
M:
OFF
OFF
1.0mm
SUCK BACK T.
I
J
110.0mm
< 2.0>
< 3 >
0.0
0/ 0
0/ 0
0/ 0
< 10.0>
< 15.0>
P1:
0.0
0.0
P2:
0/ 0
V1:
V2:
Screen 4-16
A
CHARGE MOVEMENT
:
Set on to activate automatic carriage retract after charge and
advance before injection during auto cycle.
B
CHARGE ONE TOUCH
:
Press the charge key
once
,
charge operates continuously.
Press again to stop charge.
C
INTRUSION
:
Refer to page 4-22.
D
INTRUSION T.
:
Refer to page 4-22.
E
CHARGE ON FLY:
when set on
,
charge keeps running while mold open and close is still
on process.
Remarks: Option feature.
F
SUCK BACK BEFORE CHARGE
:
Run suck back first then charge.
G
SUCK BACK AFTER CHARGE
:
Run charge first then suck back.
H
SUCK BACK BEFORE OPEN
:
Run suck back just before mold open.
I
SUCK BACK T.
:
Suck back monitor time
,
if this time is up
,
suck back stops no matter
what screw position is.
Summary of Contents for TMC 1000E
Page 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Page 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Page 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Page 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Page 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Page 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Page 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Page 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Page 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Page 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Page 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Page 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Page 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Page 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Page 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...