Injection Molding Machine Chapter 4
V3.0
4-9
2.3
Clamp open/close setting
Press
hot key or use directional key in the main menu to move the cursor to CLAMPING
and press ENTER to display CLAMPING screen.
V %
PT mm
P Bar
DECOMPRESS
LOW P/V
LOCK
CLOSE END
PT mm
P Bar
V %
V1: 0/ 0
0/ 0
V2:
0/ 0
P1: 0/ 0
P2:
100.0mm
100.0mm
210.0mm
0.5mm
M:
03D05M07Y
10h25m10s
20°C
3W
MOLD PROTECTION T.
CLOSE MONITOR T.
OPEN MONITOR T.
< 1.0> 0.0
< 5.0> 0.0
< 5.0> 0.0
< 1.0> 0.0
< 20.0> 0.0
ROBOT SIGNAL PT. / T.
CYCLE T.
INTERVAL T.
140
20
220
40.0
10
20
0
50.0
10
100
5.0
100
10
PARAMETER
CLAMP
F2
F1
F3
F4
F5
F6
F7
F8
MOLD ADJ.
LOG
SUPPORT
TENANCE
MENU
01
I/O
<220.0/ 5.0> OFF
OPEN END
120.0
50
90
4'S
3'S
2'S
1'S
180.0
50
4'S
3'S
2'S
1'S
100
100
50
CHANGE
MOLD
EXTERN
MAIN-
A
B
C
D
E
F
G
H
I
K
J
ACTION STATUS
Screen 4-6
V %
:
Speed setting in percentage
,
0%~100%.
PT mm
:
Position setting
,
uses the
※
on the panel to input decimal point.
P bar
:
Pressure setting.
A
OPEN END
:
Clamp open end position.
B
If the contact force of male and female mold halves is too strong
,
increase switching
position set value of rapid to low speed for earlier speed slow down.
C
Setting of clamp close low pressure to high pressure position
:
first of all
,
set this position
to be same as
D,
do manual clamp close
,
when mold travels to the male and female
mold touch position
,
check the present value of clamp position on the upper portion of the
screen. Take this value and add 3.0~5.0 as set value in toggle model
,
for fully hydraulic
type
,
add
0.1 to be the low pressure to high pressure switching position setting.
D
Clamp CLOSE END position
:
Toggle type is set at 5.0
:
Fully hydraulic type is set at 0.0
,
Summary of Contents for TMC 1000E
Page 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Page 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Page 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Page 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Page 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Page 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Page 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Page 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Page 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Page 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Page 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Page 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Page 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Page 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Page 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...