Injection Molding Machine Chapter 3
V3.0
3-2
It’s not necessary to prepare a fixed foundation for the machine, using machine mounting
pads with good leveling (0.2mm/M) is usually enough, in case fixed foundation is needed, call
TMC or agent to get all necessary information.
3 Transportation
3.1 Transportation preparation
a. Secure safety gates and hopper cover firmly by rope.
b. Choose appropriate transport vehicle or container according to machine dimensions and
weights.
E-series
Weight (kg)
Dimension L*W*H mm
30 1500
2500*1000*1500
60 3100
3900*1150*1850
90 3800
4100*1250*1900
120 5200
4400*1300*1950
150 5800
4600*1350*2000
200 8000
5500*1400*2200
250 10000
5850*1500*2250
350 16000
7400*1800*2400
500 25000
8700*2000*2550
750 40000
10700*2150*2850
1000 60000
12000*2450*3050
3.2 Process of transportation
3.2.1 Lift tools
a. Movable crane
:
10 tons
,
20 tons.
b. Lift car
:
5 tons
,
10 tons.
c. Wire rope
:
JIS G3525
,
type 3
,
6*19 G
,
D=18mm.
d. Steel pipe
:
JIS G3459
,
D=76.3mm
,
t=7.0mm and D=60.5mm
,
t=5.5mm. Length of pipe
must be 200mm longer than machine width.
Summary of Contents for TMC 1000E
Page 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Page 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Page 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Page 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Page 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Page 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Page 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Page 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Page 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Page 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Page 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Page 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Page 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Page 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Page 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...