Injection Molding Machine Chapter 3
V3.0
3-0
Chapter 3: Preparation for installation
and test running
1. Placing of the machine........................ 3-1
2. Foundation of the machine ................. 3-1
3. Transportation
3-2
3.1 Transportation preparation ............ 3-2
3.2 Process of transportation .............. 3-2
4. Leveling…………………………………. 3-6
5. Adjusting of mounting pad…………….. 3-7
6.Ventilation……………………………….. 3-8
7. Preparation before operation
3-9
7.1 Power supply ............................... . 3-9
7.2 Cooling water................................ 3-10
7.3 Main power/water connection
position……………………………...
3-10
7.4 Material……………………………... 3-10
7.5 Hydraulic oil
,
lubrication oil and
grease ..........................................
3-11
7.6 Operating temperature and
humidity ……………………………
3-11
8. Pre-operation checkpoints ……….…... 3-12
8.1 Check before power ON ............... 3-12
8.2 Check before motor starting ......... 3-12
8.3 Motor starting inspection............... 3-12
8.4 Check the mold condition ............. 3-14
Summary of Contents for TMC 1000E
Page 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Page 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Page 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Page 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Page 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Page 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Page 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Page 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Page 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Page 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Page 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Page 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Page 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Page 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Page 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...