Injection Molding Machine Chapter 4
V3.0
4-45
I/O board 3:
301
Robot permits mold clamping
351
Safety gate closed
302
Robot permits ejector forward
352
Automatic mode
303
Robot permits ejector retract
353
Clamp closed
304
Robot permits core in
354
Ejector advanced
305
Robot permits core out
355
Ejector retracted
306
Robot not in use
356
Core in completed.
307
High pressure filter
357
Core out completed.
308
Accumulator pressure insufficient
358
Injection not performed
311
Pneumatic power gate bumper
359
Accumulator charging
312
Pneumatic power gate close stop
362
Pneumatic power gate close
313
Pneumatic power gate open stop
363
Pneumatic power gate open
314
Pneumatic power close low speed
364
Pneumatic power gate close low speed
315
Pneumatic power gate open low speed
365
Pneumatic power gate open low speed
316
Reserved
385
Core 3 in
331
Core 3 in limit
386
Core 3 out
332
Core 3 out limit
389
Air blast valve 3
Remarks:
Some of IO may be reassigned according to special applications
,
following are
typical assignments.
I/O 150 V35 is reassigned to I/O 180.
I/O 290 shut off nozzle is reassigned to I/O 292.
I/O 53 green light is reassigned to I/O 293.
I/O 55 yellow light is reassigned to I/O 255.
I/O 268 backpressure is reassigned to I/O 266.
I/O 369 zero backpressure is reassigned to I/O 253.
Summary of Contents for TMC 1000E
Page 20: ...Injection Molding Machine Chapter 2 2 4 V3 0 2 Machine dimensions ...
Page 21: ...Injection Molding Machine Chapter 2 2 5 V3 0 3 Operating position ...
Page 22: ...Injection Molding Machine Chapter 2 2 6 V3 0 4 Safety devices layouts ...
Page 23: ...Injection Molding Machine Chapter 2 2 7 V3 0 5 Position of signs and labels ...
Page 75: ...Injection Molding Machine Chapter 4 V3 0 4 32 starts running to cool down barrel ...
Page 132: ...Injection Molding Machine Chapter 6 V3 0 6 11 4 3 Lubrication points and timing ...
Page 136: ...Injection Molding Machine Chapter 6 V3 0 6 15 32 061 120 3141 Nozzle head S45C PCS 1 ...
Page 149: ...Injection Molding Machine Appendix A A 4 V3 0 1 4 INJECTION INJECTION ...
Page 150: ...Injection Molding Machine Appendix A A 5 V3 0 ...
Page 151: ...Injection Molding Machine Appendix A A 6 V3 0 1 5 CHARGING ...
Page 152: ...Injection Molding Machine Appendix A A 7 V3 0 If CARRIAGE MOVEMENT ON then CARRIAGE RETRACT ...
Page 153: ...Injection Molding Machine Appendix A A 8 V3 0 1 6 CLAMP OPENING ...
Page 159: ...Injection Molding Machine Appendix A A 14 V3 0 1 9 2 GAS VENT SEQUENCE ...
Page 160: ...Injection Molding Machine Appendix A A 15 V3 0 1 9 3 INJECTION COMPRESSION SEQUENCE ...
Page 161: ...Injection Molding Machine Appendix A A 16 V3 0 1 9 4 GAS VENT INJECTION COMPRESSION ...