FRONT
TOP
REMOVE THIS PANEL
FILL PORT
REAR VIEW
Chamber Fluid Filling Requires:
T10 Torx Driver
Funnel
3 U.S. gallons of propylene glycol
(4 U.S. gallons for 2500ST - supplied)
CHAMBER FLUID FILLING INSTRUCTIONS
Remove top right console panel (panel above chamber)
Locate fluid fill port (under insulation and labeled "Fluid Fill Port").
Remove red cap and insert funnel into fluid fill port.
Using 3 U.S. gallons of -100° C propylene glycol mix
(4 U.S. gallons for 2500ST) fill until level is approximately
1/4" below bottom of fill port, or to bottom of funnel.
Remove funnel and replace fluid fill port cap and insulation.
Replace top right console panel.
Chamber fluid filling is now complete.
1.
2.
3.
4.
5.
6.
7.
NO PROPYLENE
GLYCOL IN THIS PORT
REVISIONS
DWN REV.
DESCRIPTION
DATE
APPROVED
DWF
D
Added funnel assembly - Drawn to SW
7/12/2013
SHEET 1 OF 1
DWG. NO.
A
DRAWN
APPLICATION
USED ON
NEXT ASSY
SIZE
CHECKED
ISSUED
TOLERANCES
.XX ±.010
±.50°
Thunder Scientific Corporation
623 Wyoming S.E. Albuquerque, NM 87123
THIS DRAWING AND INFORMATION
CONTAINED WITHIN IS PROPRIETARY
TO THUNDER SCIENTIFIC AND
CANNOT BE COPIED OR REPRODUCED
WITHOUT WRITTEN PERMISSION
FISCHER
3/13/1997
3/13/1997
3/13/1997
2500
2500ST
Chamber Fluid Filling Instructions
REV
WT.
97D25924
D
UNLESS NOTED OTHERWISE
.XXX ±.005
.X ±.015
THIRD ANGLE
PROJECTION
PRODUCTION
DESIGNATION
25-Z-24
PROPRIETARY NOTICE
203.05
SCALE: N/A