Section 2 – SR-2 Hardware Description
OPTIONAL ELECTRIC
STANDBY
(Model 50 units only)
The Electric Standby option allows the unit to be
operated on either the diesel engine or external
electric power. The units are supplied to operate on
three phase power.
CAUTION
High voltage AC power is present whenever the
unit is operating in Electric mode and whenever
the unit is connected to external standby power.
Voltages of this magnitude can be lethal.
Exercise extreme caution when working on the
unit.
Model 50 Features
The following features are standard equipment on
units equipped with Electric Standby.
•
Automatic Diesel/Electric Selection
– The unit
can be programmed to automatically switch to
electric operation when a power cord is
connected and the standby power is switched
“on”. The unit can also be programmed to
automatically switch back to diesel power if the
standby power is switched off or fails. The HMI
control panel will prompt for electric or diesel
switchover if the respective autoswitch feature is
not enabled.
Note:
The unit will automatically switch to Cycle
Sentry when the unit is manually switched or
autoswitched to electric mode.
•
Automatic Overload Reset
- The overload
relay resets automatically after the motor cools.
When the overload trips, it interrupts power to
the motor contactor coil.
•
Electric Heat
– Both hot gas and electric heat is
utilized on model 50 units. The electric heaters
are also used during defrost.
•
Automatic Phase Correction
-
The control
system features two motor contactors. One of
the connectors is energized by the phase
detection module to insure correct motor
rotation, regardless of phase rotation on the
incoming power. The motor contactors are also
mechanically interlocked.
•
Low Voltage Detection
–
The phase detection
modulation will not allow the unit to run if the
supply voltage is too low.
•
Single Phase Protection
–
The phase
detection modulation will not allow the unit to run
if it detects a single phase condition.
2-29
31 January 2005
Summary of Contents for SR-2 SmartReefer2
Page 4: ......
Page 7: ...Tab goes here and the next page should be GREEN Section 1 Safety...
Page 8: ......
Page 10: ...Section 1 SR 2 Safety Information 1 2 18 January 2005...
Page 14: ...Section 1 SR 2 Safety Information 1 6 18 January 2005...
Page 15: ...Tab goes here and the next page should be GREEN Section 2 Hardware Description...
Page 16: ......
Page 48: ...Section 2 SR 2 Hardware Description 2 32 31 January 2005...
Page 49: ...Tab goes here and the next 2 pages should be GREEN Section 3 Software Description...
Page 50: ......
Page 96: ...Section 3 SR 2 Software Description 3 46 31 January 2005...
Page 97: ...Tab goes here and the next page should be GREEN Section 4 Operation...
Page 98: ......
Page 181: ...Tab goes here and the next 2 pages should be GREEN Section 5 Diagnostics...
Page 182: ......
Page 266: ...Section 5 SR 2 Diagnostics 5 84 02 February 2005...
Page 267: ...Tab goes here and the next page should be GREEN Section 6 Service Procedures...
Page 268: ......
Page 270: ...Section 6 SR 2 Service Procedure Index Page 2 01 February 2005...
Page 282: ...Section 6 SR 2 Service Procedure A01B Page 6 P41RA01B 31 January 2005...
Page 298: ...Section 6 SR 2 Service Procedure A02A Page 12 P41RA02A 02 February 2005...
Page 318: ...Section 6 SR 2 Service Procedure A03B Page 4 P41RA03B 30 January 2005...
Page 338: ...Section 6 SR 2 Service Procedure A15A Page 4 P41RA15A 30 January 2005...
Page 360: ...Section 6 SR 2 Service Procedure A46B Page 8 P41RA46B 30 January 2005...
Page 366: ...Section 6 SR 2 Service Procedure A48A Page 6 P41RA48A 30 January 2005...
Page 376: ...Section 6 SR 2 Service Procedure A50A Page 6 P41RA50A 31 January 2005...
Page 394: ...Section 6 SR 2 Service Procedure F08A Page 4 P41RF08A 30 January 2005...
Page 398: ...Section 6 SR 2 Service Procedure F09A Page 4 P41RF09A 30 January 2005...
Page 402: ...Section 6 SR 2 Service Procedure G03A Page 4 P41RG03A 31 January 2005...
Page 406: ...Section 6 SR 2 Service Procedure H04A Page 4 P41RH04A 30 January 2005...
Page 407: ...Tab goes here and the next page should be GREEN Section 7 Service Information...
Page 408: ......
Page 410: ...Section 7 SR 2 Information 7 2 02 February 2005...
Page 419: ...Tab goes here and the next page should be GREEN Section 8 Schematics and Wiring Diagrams...
Page 420: ......
Page 422: ...Section 8 SR 2 Drawings 8 2 01 February 2005...
Page 424: ...Section 8 SR 2 Drawings 8 4 01 February 2005...
Page 425: ...8 5...
Page 426: ...8 6...
Page 427: ...8 7...
Page 428: ...8 8...
Page 429: ...8 9...
Page 430: ...8 10...
Page 431: ...8 11...