Section 2 – SR-2 Hardware Description
MICROPROCESSOR
The SR2 microprocessor is located on the rear
panel of the control enclosure. Two multi-pin
interface board connectors (J1 and J2) are located
on the front of the microprocessor. A 37 pin sensor
connector (J3) is located at the lower left of the
microprocessor. The J3 connector is used for
sensor inputs.
J1
J2
J3
ASS'Y P/N: 1E19311G01
S.P. P/N: 45-2015
S/N:XXXXXXXXXXX
REV. B000
ASS'Y P/N: 1E19308G01
S.P. P/N: 45-2013
S/N:XXXXXXXXXXX
REV. B000
A ND
C
SR2 Microprocessor.
The J1 and J2 connectors are used to mate the
microprocessor and interface board into a
single assembly.
Microprocessor Operation
The microprocessor is the heart of the control
system. It consists of the microprocessor, software,
memory, inputs and outputs. The software provides
the required operating and control functions and
supports the Service Watch Data Logger.
Inputs are used to supply power and system
information to the microprocessor. The
microprocessor uses the outputs to control the
operation of the unit components. The
microprocessor has no user serviceable
components.
Real Time Clock
The real time clock is located in the HMI Control
Panel. The time is supplied to the microprocessor
each time the unit is turned on. If the
microprocessor is changed the clock setting will be
automatically supplied to the microprocessor when
the unit is turned on.
Programmable Features
The settings of all programmable features are held
in non-volatile memory in the microprocessor. The
settings are supplied to the HMI Control Panel each
time the unit is turned on. If the microprocessor is
changed, all programmable features must be
reprogrammed.
2-9
31 January 2005
Summary of Contents for SR-2 SmartReefer2
Page 4: ......
Page 7: ...Tab goes here and the next page should be GREEN Section 1 Safety...
Page 8: ......
Page 10: ...Section 1 SR 2 Safety Information 1 2 18 January 2005...
Page 14: ...Section 1 SR 2 Safety Information 1 6 18 January 2005...
Page 15: ...Tab goes here and the next page should be GREEN Section 2 Hardware Description...
Page 16: ......
Page 48: ...Section 2 SR 2 Hardware Description 2 32 31 January 2005...
Page 49: ...Tab goes here and the next 2 pages should be GREEN Section 3 Software Description...
Page 50: ......
Page 96: ...Section 3 SR 2 Software Description 3 46 31 January 2005...
Page 97: ...Tab goes here and the next page should be GREEN Section 4 Operation...
Page 98: ......
Page 181: ...Tab goes here and the next 2 pages should be GREEN Section 5 Diagnostics...
Page 182: ......
Page 266: ...Section 5 SR 2 Diagnostics 5 84 02 February 2005...
Page 267: ...Tab goes here and the next page should be GREEN Section 6 Service Procedures...
Page 268: ......
Page 270: ...Section 6 SR 2 Service Procedure Index Page 2 01 February 2005...
Page 282: ...Section 6 SR 2 Service Procedure A01B Page 6 P41RA01B 31 January 2005...
Page 298: ...Section 6 SR 2 Service Procedure A02A Page 12 P41RA02A 02 February 2005...
Page 318: ...Section 6 SR 2 Service Procedure A03B Page 4 P41RA03B 30 January 2005...
Page 338: ...Section 6 SR 2 Service Procedure A15A Page 4 P41RA15A 30 January 2005...
Page 360: ...Section 6 SR 2 Service Procedure A46B Page 8 P41RA46B 30 January 2005...
Page 366: ...Section 6 SR 2 Service Procedure A48A Page 6 P41RA48A 30 January 2005...
Page 376: ...Section 6 SR 2 Service Procedure A50A Page 6 P41RA50A 31 January 2005...
Page 394: ...Section 6 SR 2 Service Procedure F08A Page 4 P41RF08A 30 January 2005...
Page 398: ...Section 6 SR 2 Service Procedure F09A Page 4 P41RF09A 30 January 2005...
Page 402: ...Section 6 SR 2 Service Procedure G03A Page 4 P41RG03A 31 January 2005...
Page 406: ...Section 6 SR 2 Service Procedure H04A Page 4 P41RH04A 30 January 2005...
Page 407: ...Tab goes here and the next page should be GREEN Section 7 Service Information...
Page 408: ......
Page 410: ...Section 7 SR 2 Information 7 2 02 February 2005...
Page 419: ...Tab goes here and the next page should be GREEN Section 8 Schematics and Wiring Diagrams...
Page 420: ......
Page 422: ...Section 8 SR 2 Drawings 8 2 01 February 2005...
Page 424: ...Section 8 SR 2 Drawings 8 4 01 February 2005...
Page 425: ...8 5...
Page 426: ...8 6...
Page 427: ...8 7...
Page 428: ...8 8...
Page 429: ...8 9...
Page 430: ...8 10...
Page 431: ...8 11...