Section 2 – SR-2 Hardware Description
Programmable Features
Display Heater
The settings of all programmable features are held
in non-volatile memory in the microprocessor. The
settings are supplied to the HMI Control Panel each
time the unit is turned on. If the HMI Control Panel
is changed, the current programmable feature
settings will be supplied to the HMI Control Panel
when the unit is turned on.
The HMI control panel is equipped with a display
heater. This heater is needed to make the display
visible in cold ambient temperatures.
The HMI has its own internal temperature sensor for
the display heater. The heater is energized when
the unit is turned on and the ambient temperature is
below 29.4°F (-2°C). The heater turns off when the
temperature sensed by the internal sensor rises
above 37.4°F (+3°C). The heater draws from 1.4 to
1.7 amps when energized.
Fuse F10
When interface board fuse F10 is installed in the
upper position, the On/Off keys on the HMI turn the
unit on and off. When fuse F10 is installed in the
lower position the unit will start and run without the
HMI control panel. Do not operate the unit with the
F10 fuse installed in the lower position unless
absolutely necessary.
The colder the ambient temperature the longer it will
take for the heater to make the display visible on a
cold startup. It may take 10-15 seconds for the
display to appear with very cold temperatures.
2-7
31 January 2005
Summary of Contents for SR-2 SmartReefer2
Page 4: ......
Page 7: ...Tab goes here and the next page should be GREEN Section 1 Safety...
Page 8: ......
Page 10: ...Section 1 SR 2 Safety Information 1 2 18 January 2005...
Page 14: ...Section 1 SR 2 Safety Information 1 6 18 January 2005...
Page 15: ...Tab goes here and the next page should be GREEN Section 2 Hardware Description...
Page 16: ......
Page 48: ...Section 2 SR 2 Hardware Description 2 32 31 January 2005...
Page 49: ...Tab goes here and the next 2 pages should be GREEN Section 3 Software Description...
Page 50: ......
Page 96: ...Section 3 SR 2 Software Description 3 46 31 January 2005...
Page 97: ...Tab goes here and the next page should be GREEN Section 4 Operation...
Page 98: ......
Page 181: ...Tab goes here and the next 2 pages should be GREEN Section 5 Diagnostics...
Page 182: ......
Page 266: ...Section 5 SR 2 Diagnostics 5 84 02 February 2005...
Page 267: ...Tab goes here and the next page should be GREEN Section 6 Service Procedures...
Page 268: ......
Page 270: ...Section 6 SR 2 Service Procedure Index Page 2 01 February 2005...
Page 282: ...Section 6 SR 2 Service Procedure A01B Page 6 P41RA01B 31 January 2005...
Page 298: ...Section 6 SR 2 Service Procedure A02A Page 12 P41RA02A 02 February 2005...
Page 318: ...Section 6 SR 2 Service Procedure A03B Page 4 P41RA03B 30 January 2005...
Page 338: ...Section 6 SR 2 Service Procedure A15A Page 4 P41RA15A 30 January 2005...
Page 360: ...Section 6 SR 2 Service Procedure A46B Page 8 P41RA46B 30 January 2005...
Page 366: ...Section 6 SR 2 Service Procedure A48A Page 6 P41RA48A 30 January 2005...
Page 376: ...Section 6 SR 2 Service Procedure A50A Page 6 P41RA50A 31 January 2005...
Page 394: ...Section 6 SR 2 Service Procedure F08A Page 4 P41RF08A 30 January 2005...
Page 398: ...Section 6 SR 2 Service Procedure F09A Page 4 P41RF09A 30 January 2005...
Page 402: ...Section 6 SR 2 Service Procedure G03A Page 4 P41RG03A 31 January 2005...
Page 406: ...Section 6 SR 2 Service Procedure H04A Page 4 P41RH04A 30 January 2005...
Page 407: ...Tab goes here and the next page should be GREEN Section 7 Service Information...
Page 408: ......
Page 410: ...Section 7 SR 2 Information 7 2 02 February 2005...
Page 419: ...Tab goes here and the next page should be GREEN Section 8 Schematics and Wiring Diagrams...
Page 420: ......
Page 422: ...Section 8 SR 2 Drawings 8 2 01 February 2005...
Page 424: ...Section 8 SR 2 Drawings 8 4 01 February 2005...
Page 425: ...8 5...
Page 426: ...8 6...
Page 427: ...8 7...
Page 428: ...8 8...
Page 429: ...8 9...
Page 430: ...8 10...
Page 431: ...8 11...