Section 6 – SR-2 Service Procedure Index
Table of Contents Section 6
A01A
Microprocessor/Interface Board Functional Test
A01B
HMI Control Panel Functional Test
A01C
HMI Control Panel Self Test
A02A
Recording Existing Microprocessor Settings
A03A
Replacement of the Microprocessor or Interface Board
A03B
Replacement of the HMI Control Panel
A04A Microprocessor
Setup
A05A
Clock/Calendar Setup (See Section 4)
A06A
Checking Software Revision (See Section 4)
A07A
Performing a Cold Start
A15A
Temperature Sensor Grade Calibration
A17A
Full Pretrip Test (See Section 4)
A26A
Welding on Units Equipped with Microprocessors
A28A
Setting Unit Running Time Hourmeters
A34A
Operating Service Test Mode (See Section 4)
A44A
Operating Interface Board Test Mode (See Section 4)
A46A
Flash Loading Microprocessor Software
A46B
Flash Loading HMI Control Panel Software
A48A
Phase Detect Module Operation and Diagnostics
A49A
CargoWatch Data Logger
A50A
ServiceWatch Data Logger
D01A
Temperature Sensor Test
D03A
Pressure Sensor Test
F01A
Checking and Replacing the Oil Level Switch
F05A
Checking the Oil Pressure Switch
F07A
Optical Coolant Level Sensor Test
F07B
Magnetic Coolant Level Switch
F08A
Coolant Temperature Sensor Test
F09A
RPM Sensor Test and Adjustment
G03A
Electronic Throttling Valve (ETV) Test
H04A
Wiring Harness Continuity Test
Page 1
01 February 2005
Summary of Contents for SR-2 SmartReefer2
Page 4: ......
Page 7: ...Tab goes here and the next page should be GREEN Section 1 Safety...
Page 8: ......
Page 10: ...Section 1 SR 2 Safety Information 1 2 18 January 2005...
Page 14: ...Section 1 SR 2 Safety Information 1 6 18 January 2005...
Page 15: ...Tab goes here and the next page should be GREEN Section 2 Hardware Description...
Page 16: ......
Page 48: ...Section 2 SR 2 Hardware Description 2 32 31 January 2005...
Page 49: ...Tab goes here and the next 2 pages should be GREEN Section 3 Software Description...
Page 50: ......
Page 96: ...Section 3 SR 2 Software Description 3 46 31 January 2005...
Page 97: ...Tab goes here and the next page should be GREEN Section 4 Operation...
Page 98: ......
Page 181: ...Tab goes here and the next 2 pages should be GREEN Section 5 Diagnostics...
Page 182: ......
Page 266: ...Section 5 SR 2 Diagnostics 5 84 02 February 2005...
Page 267: ...Tab goes here and the next page should be GREEN Section 6 Service Procedures...
Page 268: ......
Page 270: ...Section 6 SR 2 Service Procedure Index Page 2 01 February 2005...
Page 282: ...Section 6 SR 2 Service Procedure A01B Page 6 P41RA01B 31 January 2005...
Page 298: ...Section 6 SR 2 Service Procedure A02A Page 12 P41RA02A 02 February 2005...
Page 318: ...Section 6 SR 2 Service Procedure A03B Page 4 P41RA03B 30 January 2005...
Page 338: ...Section 6 SR 2 Service Procedure A15A Page 4 P41RA15A 30 January 2005...
Page 360: ...Section 6 SR 2 Service Procedure A46B Page 8 P41RA46B 30 January 2005...
Page 366: ...Section 6 SR 2 Service Procedure A48A Page 6 P41RA48A 30 January 2005...
Page 376: ...Section 6 SR 2 Service Procedure A50A Page 6 P41RA50A 31 January 2005...
Page 394: ...Section 6 SR 2 Service Procedure F08A Page 4 P41RF08A 30 January 2005...
Page 398: ...Section 6 SR 2 Service Procedure F09A Page 4 P41RF09A 30 January 2005...
Page 402: ...Section 6 SR 2 Service Procedure G03A Page 4 P41RG03A 31 January 2005...
Page 406: ...Section 6 SR 2 Service Procedure H04A Page 4 P41RH04A 30 January 2005...
Page 407: ...Tab goes here and the next page should be GREEN Section 7 Service Information...
Page 408: ......
Page 410: ...Section 7 SR 2 Information 7 2 02 February 2005...
Page 419: ...Tab goes here and the next page should be GREEN Section 8 Schematics and Wiring Diagrams...
Page 420: ......
Page 422: ...Section 8 SR 2 Drawings 8 2 01 February 2005...
Page 424: ...Section 8 SR 2 Drawings 8 4 01 February 2005...
Page 425: ...8 5...
Page 426: ...8 6...
Page 427: ...8 7...
Page 428: ...8 8...
Page 429: ...8 9...
Page 430: ...8 10...
Page 431: ...8 11...