Section 5 – SR-2 Diagnostics
10 HIGH DISCHARGE PRESSURE
Page 1 of
Alarm Type
Prevent or Shutdown Alarm
Associated Alarm
Codes
Alarm Code 84 Restart Null
Component Description and Location
The high pressure cutout switch (HPCO) is located on the compressor discharge manifold.
Circuit Description
The high pressure cutout circuit is a two wire circuit. The HPCO wire connects the interface board 36 pin connector
J7 pin 17 to one side of the high pressure cutout switch. The PHPC wire connects the interface board 36 pin
connector J7 pin 18 to the other side of the high pressure cutout switch. The switch is not polarity sensitive. The
switch wires are routed in the Main Harness. The switch is connected to the sensor harness with a Deutsch
connector.
How Alarm is Set
1. Set as a Prevent alarm if the HPCO switch opens. Three attempts will be made to allow continued
operation at temporarily reduced performance. If, at the end of the three attempts full performance is not
possible, the alarm is set as a Shutdown alarm.
If continuous restarts are enabled, a shutdown alarm is not set after 3 attempts.
If restarts are disabled, the alarm will be set as a shutdown on the first occurrence.
2. Set as a Prevent alarm if the discharge pressure exceeds a pre-set value and the discharge pressure
transducer is not failed. Three attempts will be made to allow continued operation at temporarily reduced
performance. If, at the end of the three attempts full performance is not possible, the alarm is set as a
Shutdown alarm.
If continuous restarts are enabled, a shutdown alarm is not set after 3 attempts.
If restarts are disabled, the alarm will be set as a shutdown on the first occurrence.
How Alarm is Cleared
1. The alarm can be cleared manually if the condition no longer exists.
2. The alarm will clear automatically at the conclusion of a successful prevent routine.
Considerations
If the HPCO switch is open it will always shut the unit down. The switch contacts break power to the Run Relay.
Diagnostic Procedure
1. Check the refrigeration system for high discharge pressure and correct as required.
2. Check interface board fuse F1.
5-21
02 February 2005
Summary of Contents for SR-2 SmartReefer2
Page 4: ......
Page 7: ...Tab goes here and the next page should be GREEN Section 1 Safety...
Page 8: ......
Page 10: ...Section 1 SR 2 Safety Information 1 2 18 January 2005...
Page 14: ...Section 1 SR 2 Safety Information 1 6 18 January 2005...
Page 15: ...Tab goes here and the next page should be GREEN Section 2 Hardware Description...
Page 16: ......
Page 48: ...Section 2 SR 2 Hardware Description 2 32 31 January 2005...
Page 49: ...Tab goes here and the next 2 pages should be GREEN Section 3 Software Description...
Page 50: ......
Page 96: ...Section 3 SR 2 Software Description 3 46 31 January 2005...
Page 97: ...Tab goes here and the next page should be GREEN Section 4 Operation...
Page 98: ......
Page 181: ...Tab goes here and the next 2 pages should be GREEN Section 5 Diagnostics...
Page 182: ......
Page 266: ...Section 5 SR 2 Diagnostics 5 84 02 February 2005...
Page 267: ...Tab goes here and the next page should be GREEN Section 6 Service Procedures...
Page 268: ......
Page 270: ...Section 6 SR 2 Service Procedure Index Page 2 01 February 2005...
Page 282: ...Section 6 SR 2 Service Procedure A01B Page 6 P41RA01B 31 January 2005...
Page 298: ...Section 6 SR 2 Service Procedure A02A Page 12 P41RA02A 02 February 2005...
Page 318: ...Section 6 SR 2 Service Procedure A03B Page 4 P41RA03B 30 January 2005...
Page 338: ...Section 6 SR 2 Service Procedure A15A Page 4 P41RA15A 30 January 2005...
Page 360: ...Section 6 SR 2 Service Procedure A46B Page 8 P41RA46B 30 January 2005...
Page 366: ...Section 6 SR 2 Service Procedure A48A Page 6 P41RA48A 30 January 2005...
Page 376: ...Section 6 SR 2 Service Procedure A50A Page 6 P41RA50A 31 January 2005...
Page 394: ...Section 6 SR 2 Service Procedure F08A Page 4 P41RF08A 30 January 2005...
Page 398: ...Section 6 SR 2 Service Procedure F09A Page 4 P41RF09A 30 January 2005...
Page 402: ...Section 6 SR 2 Service Procedure G03A Page 4 P41RG03A 31 January 2005...
Page 406: ...Section 6 SR 2 Service Procedure H04A Page 4 P41RH04A 30 January 2005...
Page 407: ...Tab goes here and the next page should be GREEN Section 7 Service Information...
Page 408: ......
Page 410: ...Section 7 SR 2 Information 7 2 02 February 2005...
Page 419: ...Tab goes here and the next page should be GREEN Section 8 Schematics and Wiring Diagrams...
Page 420: ......
Page 422: ...Section 8 SR 2 Drawings 8 2 01 February 2005...
Page 424: ...Section 8 SR 2 Drawings 8 4 01 February 2005...
Page 425: ...8 5...
Page 426: ...8 6...
Page 427: ...8 7...
Page 428: ...8 8...
Page 429: ...8 9...
Page 430: ...8 10...
Page 431: ...8 11...