
LLZ 421
Operation
Operation and Maintenance
ILS 420
3−18
Ed. 01.10
SOAC
In the Monitor Standby window the following button definitions are used:
− S1
MENU
to return to the Menu List window
− S2
blank
not used in this window
− S3
blank
not used in this window
− S4
EXE−MON
to go to Monitor Exec. & Field window (see Fig. 3−16)
1
4
2
3
1
4
2
3
LOAD: TX2 / ON STANDBY−ALL
1 MONITOR 2
CRS POS RF % 100.8 100.8
DDM % 0.0 0.0
SDM % 39.0 39.1
CRS WDTH RF % 100.6 100.6
DDM % 15.6 15.2
SDM % 39.2 39.3
CLR WDTH RF % 100.3 100.2
DDM % 24.0 24.2
SDM % 39.8 39.7
MENU EXE−MON
MENU LIST
−−−−−−−−−−−
SHOW ALERTS
CONTROL
MONITOR QUICK ACCESS
MONITOR EXEC & FIELD all parameters
> MONITOR STANDBY all parameters
POWER SUPPLIES
WAVEFORM DATA / FLIGHT CHECK
POWER AMPLIFIER DATA (CRS and CLR)
MTBO
CONFIGURATION DATA
ENTER
↑
SELECT
↓
STATUS
1.
2.
control buttons (S)
Fig. 3−17
MONITOR STANDBY select and Monitor Standby window (example)
In the Power Supplies window the following button definitions are used:
− S1
MENU
to return to the Menu List window
− S2
blank
not used in this window
− S3
blank
not used in this window
− S4
STATUS
to return to the Status window (see Fig. 3−6)
1
4
2
3
1
4
2
3
POWER SUPPLIES TX 1 TX 2
+ 5 VOLTS BUS 5.00 5.00
+ 15 VOLTS BUS 14.85 14.85
− 15 VOLTS BUS −15.00 −15.04
+ 24 VOLTS BUS 24.00 24.00
BATTERY VOLTAGE 53.77 53.77
MENU STATUS
MENU LIST
−−−−−−−−−−−
SHOW ALERTS
CONTROL
MONITOR QUICK ACCESS
MONITOR EXEC & FIELD all parameters
MONITOR STANDBY all parameters
> POWER SUPPLIES
WAVEFORM DATA / FLIGHT CHECK
POWER AMPLIFIER DATA (CRS and CLR)
MTBO
CONFIGURATION DATA
ENTER
↑
SELECT
↓
STATUS
1.
2.
control buttons (S)
Fig. 3−18
POWER SUPPLIES select and Power Supplies window (example)
Summary of Contents for 421
Page 2: ......
Page 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Page 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Page 56: ......
Page 58: ......
Page 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Page 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Page 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Page 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Page 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Page 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Page 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...