
LLZ 421
Operation and Maintenance
Installation
ILS 420
2−25
Ed. 01.04
SOAC
BP MODPA
J1
J2
XMTR1
XMTR2
TX2
TX1
SBO
CSB
SBO
CSB
SBO
CSB
CRS
CLR
CLR
SBO
CSB
CRS
CLRSBO
stby SBO
IN1
OUT
J10
J12
J11
J28
J7
J9
J8
J27
J4
J6
J5
J26
J1
J3
J2
J25
CLRCSB
CRSSBO
CRSCSB
IN2
IN1
OUT
IN2
IN1
OUT
IN2
IN1
OUT
IN2
stby CSB
stby SBO
stby CSB
J31
J10
J9
J8
J7
J4
J1
J3
J5
J2
J47
J6
J17
J18
J16
J12
J13
J15
J14
J11
J20
RFcwCLR TX1
RFcwCRS TX1
RFcwCRS TX2
RFcwCLR TX2
J21
Stby
Stby
CLR Width (1)
CLR*
NFM
CRS Posn.
CSB*
CLR CSB
CLR SBO
CRS Width
SBO*
Stby
CRS CSB
Stby
CRS SBO
J7
J7
J7
J7
SOAC rear
PIN−Diode Transfer Switch, rear
transmitter rack, connector panel on top
J9
J25
J27
HF out
J2
J8 J1
HF in
J29
J28
W12
W11
W10
W9
W6
W5
W8
W7
W36
W34
W33
W35
W30
W27
W29
W31
W34
W33
W36
W35
W16
W15
W14
W13
W8
W12
W7
W11
W6
W10
W5
W9
W45
W44
W43
W24
W42
J18/BP−Digital
W37
to
MODP
A 2 CLR
MODP
A 2 CRS
MODP
A 1 CLR
CRS
CLR
CLR Width
NFM (1)
CRS Width/SBO*
CRS Posn./CSB*
* with
LPD−antenna
MODP
A 1 CRS
Fig. 2−24
RF−cabling transmitter rack (example LLZ−2F), without SYN RF cabling
Ed. 01.10
Summary of Contents for 421
Page 2: ......
Page 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Page 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Page 56: ......
Page 58: ......
Page 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Page 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Page 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Page 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Page 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Page 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Page 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...