
LLZ 421
Operation and Maintenance
Alignment Procedure LLZ−1F (Dip./Refl.)
ILS 420
4−15
Ed. 01.10
SOAC
4.4.4
Calibration and Normalization of Standby Monitors
NOTE:
Before performing this procedure it is recommended to check alarm limits acc. 4.4.5.
a) Switch TX2 on.
4.4.4.1
COURSE POSITION STANDBY Monitor
a) RF−level of the corresponding path on the SOAC (Fig. 4−2, 4−3) is set to amplitude of 3.6 Vpp
b) Open dialog ’Monitor1−Nominal Values’ and open dialog ’Monitor2−Nominal Values’. Enter the
values for ’Stby CRS Position DDM’ and ’Stby CRS Position SDM’.
c) Open dialog ’Transmitter2−Waveform Data#1’. Note down the value of ’CRS SBO Amplitude’ of
Standby TX (TX2). Set it to 0.
d) Send to Monitor1/2 the command ’Calibration, Standby CRS Position Detector’.
e) Restore TX2 SBO setting of 4.4.4.1 c) back to normal.
f) Send to Monitor1/2 the command ’Normalization, Standby CRS Position Detector’.
4.4.4.2
COURSE WIDTH STANDBY Monitor
a) RF−level of the corresponding path on the SOAC (Fig. 4−2, 4−3) is set to amplitude of 3.6 Vpp
b) Open dialog ’Monitor1−Nominal Values’ and open dialog ’Monitor2−Nominal Values’. Enter the
value for ’Stby CRS WIDTH DDM’.
c) Open dialog ’Transmitter2−Waveform Data#1’. Note down the value of ’CRS SBO Amplitude’ of
Standby TX (TX2). Set it to 0.
d) Send to Monitor1/2 the command ’Calibration, Standby CRS Width detector’.
e) Restore TX2 SBO setting of 4.4.4.2 c) back to normal.
f) Send to Monitor1/2 the command ’Normalization, Standby CRS Width detector’.
g) Set ’Ident keying’ of both transmitters to ’keyed’ again.
NOTE:
If it is not set, the monitor indicates green, but the TX may perform a shutdown after about 10 s.
Summary of Contents for 421
Page 2: ......
Page 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Page 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Page 56: ......
Page 58: ......
Page 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Page 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Page 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Page 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Page 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Page 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Page 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...