
LLZ 421
General
Operation and Maintenance
ILS 420
1−2
Ed. 01.04
SOAC
WARNING
Hold the transmitter cabinet firmly in position until the support angles (Fig. 1−3/3 and 5)
have been dismantled. Pay special attention when removing the lower support angle.
− Undo the two screws (M10) left and right on the upper support angles (Fig. 1−3/5). Remove the
screws and washers and the upper support angles left and right. Tilt the transmitter cabinet (Fig.
1−3/6) forward slightly, hold it and dismantle the lower support angle (Fig. 1−3/3). Then carry the
transmitter cabinet to its point of installation and screw to the floor.
− Open the front door and remove the foam panel behind it.
− Close the front door.
Store away all despatch packaging (Fig. 1−3), so that it can be used again for transport purposes
if required. Use the original packaging components to repack. Repack the equipment and subassem-
blies as described above, but in reverse sequence.
1
Telescope box
2
Plastic ribbon
3
lower support angle
(ref. no. 36480 28009)
4
Pallet
5
upper support angle (2x)
(ref. no. 36385 28026)
6
Transmitter cabinet
7
Foam panel
1
2
7
ÂÂÂ
ÂÂÂ
ÂÂÂ
ÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄ
ÂÂ
Ä
Ä
ÄÄ
ÄÄÄ
ÄÄ
ÄÄÄÄÄ
ÄÄÄÄÄ
ÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄ
ÄÄÄÄÄÄÄÄÄÄ
3
6
ÂÂÂ
ÂÂÂ
ÂÂÂ
ÂÂÂ
ÂÂÂ
4
5
Fig. 1−3
Packing for rail and road transport
Summary of Contents for 421
Page 2: ......
Page 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Page 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Page 56: ......
Page 58: ......
Page 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Page 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Page 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Page 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Page 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Page 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Page 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...