
LLZ 421
Installation
Operation and Maintenance
ILS 420
2−14
Ed. 01.04
SOAC
ADU
Transmitter rack
W54
W55
N/m
Shelter
N/m
N/f
N/f
Bottom plate
W104
W105
Nearfield Dipole
N/f
W41
W42
1)
1)
2)
1)
W54 and W55, W56 and W57:
24029 28536
2)
W41 to W42 (1F)
27288 04104, used if W104/105
≥
1/2" cable
W81 to W84 (2F)
27288 04104, used if W104/105, W106/107
≥
1/2" cable
CRS CSB
CRS SBO
CRS CSB
CRS SBO
LLZ antenna 1F
(optional)
2)
ADU
Transmitter rack
W54
W55
N/m
Shelter
N/m
N/f
N/f
Bottom plate
W104
W105
Nearfield Dipole
N/f
W81
W82
1)
1)
2)
CRS CSB
CRS SBO
CRS CSB
CRS SBO
LLZ antenna 2F
(optional)
2)
1F
2F
W56
W57
N/m
W106
W107
W83
W84
1)
1)
2)
CLR CSB
CLR SBO
CLR CSB
CLR SBO
2)
N/m
W51
W52
N/m
N/m
N/f
N/f
W101
W102
A1/CRS PATH/
A3/CRS WIDTH/
Posn. CRS
Width CRS
W53
W58
W103
W108
CLW1
NFM1
Width CLR
Posn. NF
W51
W52
N/m
N/m
N/f
N/f
W101
W102
Posn. CRS
Width CRS
W58
W108
Posn. NF
A1/CRS PATH/
A3/CRS WIDTH/SBO
NFM1
(opt.)
(opt.)
NFM2
(opt.)
NFM2
(opt.)
Z1 (6 dB), optional
CSB
CSB
SBO
Fig. 2−16
RF cabling LLZ1F/2F
Ed. 06.05
Summary of Contents for 421
Page 2: ......
Page 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Page 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Page 56: ......
Page 58: ......
Page 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Page 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Page 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Page 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Page 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Page 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Page 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...