
LLZ 421
Operation and Maintenance
Alignment Procedure LLZ−2F (Dip./Refl.)
ILS 420
5−17
Ed. 07.08
SOAC
5.4.3.2
Integral Monitoring Width (DDM 15.5 %), optional
NOTE:
No adjustment, if the opt. phase shifter is not used. The value indicated by the monitor or the value
measured with the DDM−instrument at the output of the integral network is used as nominal value.
a) RF−level of the corresponding path on the SOAC (Fig. 5−2, 5−3) is set to amplitude of 3.6 Vpp
b) Set DDM indication to −15.5 % with optional external phase shifter (mounted right or left) in the
integral network (Fig. 5−6) with the portable DDM instrument at the output ’
Width Integral
’ of the
course integral network.
c) Open dialog ’Monitor1−Nominal Values’ and open dialog ’Monitor2−Nominal Values’. Enter the
measured values for ’EXEC CRS Width DDM’.
d) Open dialog ’Transmitter1−Waveform Data#1’. Note down the values of ’CRS SBO Amplitude’
and ’CLR SBO Amplitude’. Set them all to 0.
e) Send to Monitor1/2 the command ’Calibration, Executive CRS Width detector’.
f) Restore TX1 SBO settings of 5.4.3.2 d) back to normal.
g) Send to Monitor1/2 the command ’Normalization, Executive CRS Width detector’.
Loosen swivel nut and adjust by
sliding the upper part more or
less out or in. Finally fix nut
again.
If setting range does not match
insert additional cable.
External phase shifter component
Fig. 5−6
Integral network (located in the ADU), adjustment of optional phase shifter
5.4.3.3
Clearance Width Monitor
a) RF−level of the corresponding path on the SOAC (Fig. 5−2, 5−3) is set to amplitude of 3.6 Vpp
b) Measure DDM with the field receiver. Note down value (used in 5.4.4.3).
c) Open dialog ’Monitor1−Nominal Values’ and open dialog ’Monitor2−Nominal Values’. Enter the
measured values for ’EXEC CLR Width DDM’ and ’EXEC CLR Width SDM’.
d) Open dialog ’Transmitter1−Waveform Data#1’. Note down the values of ’CLR SBO Amplitude’
and ’CRS SBO Amplitude’. Set them all to 0.
e) Send to Monitor1/2 the command ’Calibration, Executive CLR Width detector’.
f) Restore TX1 SBO settings of 5.4.3.3 d) back to normal.
g) Send to Monitor1/2 the command ’Normalization, Executive CLR Width detector’.
Summary of Contents for 421
Page 2: ......
Page 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Page 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Page 56: ......
Page 58: ......
Page 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Page 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Page 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Page 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Page 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Page 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Page 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...