
LLZ 421
Operation and Maintenance
Installation
ILS 420
2−19
Ed. 01.04
SOAC
2.4.4.7
OIO LCP IN (J4)
SubD, 25pin, male, from connector X2 LCP
PIN
ASSIGNMENT
PIN
ASSIGNMENT
1
GND
14
VCC (+5 V)
2
TTLOUT3
(internal use)
15
IAUX0
3
IAUX1
16
IAUX2
4
IAUX3
17
IAUX4
5
IAUX5
18
IAUX6
6
IAUX7
19
IAUX8
7
IAUX9
20
IAUX10
8
IAUX11
21
IAUX12
9
IAUX13
22
IAUX14
10
IAUX15
23
TTLIN0
(internal use)
11
TTLIN1
(internal use)
24
TTLIN2
(internal use)
12
TTLOUT4
(internal use)
25
TTLIN3
(internal use)
13
GND
2.4.4.8
OIO LCP OUT (J5)
SubD, 25 pin, female, from connector X2 LCP
(assignment for J5 with rotated and not rotated connection)
PIN
ASSIGNMENT
(refer to Fig. 2−15)
PIN
ASSIGNMENT
J5 rotated
J5 not rotated
(previously)
J5 rotated
J5 not rotated
(previously)
1
COM3
GND
14
COM4 (common 4) VCC (+5 V)
2
TTLOUT2
(internal)
TTLOUT1
(internal)
15
OAUX0
TTLOUT0
(internal)
3
OAUX1
COM2 (common 2)
16
OAUX2
OAUX15
4
OAUX3
OAUX14
17
OAUX4
OAUX13
5
OAUX5
OAUX12
18
OAUX6
OAUX11
6
OAUX7
OAUX10
19
COM1 (common 1) OAUX9
7
OAUX8
OAUX8
20
OAUX9
COM1 (common 1)
8
OAUX10
OAUX7
21
OAUX11
OAUX6
9
OAUX12
OAUX5
22
OAUX13
OAUX4
10
OAUX14
OAUX3
23
OAUX15
OAUX2
11
COM2 (common 2) OAUX1
24
TTLOUT0
(internal)
OAUX0
12
TTLOUT1
(internal)
TTLOUT2
(intern.)
25
VCC (+5 V)
COM4 (common 4)
13
GND
COM3 (common 3)
2.4.4.9
PHONE 1 (J7, rear of cabinet)
RJ11/6, at BP, wired via XA12 (Jumper 1)
PIN
ASSIGNMENT
PIN
ASSIGNMENT
1
n.c.
4
MODEM1 RING (Lb)
2
n.c.
5
n.c.
3
MODEM1 TIP (La)
6
n.c.
2.4.4.10
PHONE 2 (J10, rear of cabinet)
RJ11/6, at BP, wired via XA12 (Jumper 1)
PIN
ASSIGNMENT
PIN
ASSIGNMENT
1
n.c.
4
MODEM2 RING (Lb)
2
n.c.
5
n.c.
3
MODEM2 TIP (La)
6
n.c.
Ed. 06.07
Summary of Contents for 421
Page 2: ......
Page 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Page 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Page 56: ......
Page 58: ......
Page 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Page 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Page 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Page 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Page 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Page 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Page 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...