
LLZ 421
Operation and Maintenance
Installation
ILS 420
2−5
Ed. 01.04
SOAC
8
1
Air Conditioner (2x)
2
Support (2x)
3
Absorber (4x) with M12 screw thread ,
fixing points for LLZ− or GP transmitter rack
4
Threaded insert M8 for earthing the transmitter rack
5
Sealing frame, 1 upper part and 2 side parts (2x)
6
Absorber (4x) with M12 screw thread ,
fixing points for DME transponder
7
Bookshelf
8
3 cell cable duct, right
9
Cover for cable through entry, right
10 Battery compartment
11 Anchor rod
12 Clamp strap
13 Insert to ISO corner (support part for clamp strap)
14 ISO−container corner
15 Battery fuse box
16 Battery compartment airing
17 Door lock, wall part
18 Wall mounted holding device for shelter documentation
19 Cover for cable through entry, left
20 Bottom surface profile (contains spare key for shelter door)
21 Door lock
22 Earthing main connector (at exterior wall side)
23 Potential equalisation bar
24 Fire extinguisher
9
19
25
Â
Â
21
7
16
2
5
31
36
22
17
20
10
1
3
4
35
37
38
15
27
28
29
32
25 3 cell cable duct, left
26 Heating (optional)
27 Phone connecting box
28 AF−distribution
29 Mains distribution
30 Cable through for twilight switch
31 Cable through for obstruction light
32 Cable through parts (PG 13,5)
33 Twilight switch
34 Obstruction light (2x)
35 Connecting box for obstruction lights and twilight switch
36 Spare fluorescent tube
37 Artificial lighting for interiors (2x)
38 Room thermostat for air conditioner
18
26
24
23
6
30
33
34
11
12
13
14
Fig. 2−6
10 ft container shelter, inner details
Summary of Contents for 421
Page 2: ......
Page 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Page 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Page 56: ......
Page 58: ......
Page 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Page 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Page 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Page 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Page 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Page 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Page 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...