LLZ 421
Operation and Maintenance
Operation
ILS 420
3−7
Ed. 01.07
SOAC
3.3.1
Controls and Test Points at the Stby and On−Air Combiner (SOAC)
The following table lists the control elements (potentiometer) and test points used for first setup.
Control
Test point
Function
Remarks
aerial RF in
Gain adjustment input
R105
R90
R62
R43
R275
R286
TP18,TP41
TP16
TP12
TP8
TP24
TP71
IF gain adjust of nearfield monitor input signal (NFM)
IF gain adjust of LLZ CRS Posn. input signal (CSB*)
not with LLZ
IF gain adjust of LLZ CRS Width (SBO*) input signal
IF gain adjust of LLZ CLR Width 2 input signal
IF gain adjust of LLZ CLR Width 1 input signal
−
−
−
−
not used
−
aerial IF path
phase adjustment
R166
R353
R345
R150,146
R189,185
TP13
TP11
TP25
TP27
TP26
TP6,TP9
TP14,TP17
Phase adjust of LLZ CRS Width signal; only with LPD antenna
used for mid set of R166 resistance range
Phase adjust of LLZ CLR Width (1) signal; no need for LLZ
Phase adjust of LLZ CLR Width (1) signal; no need for LLZ
used for mid set of R345 resistance range; not for 1F
path not used in LLZ
path not used in LLZ
w. LPD antenna
factory aligned
not applicable
not applicable
factory aligned
−
−
aerial IF path
Level adjustment output
R377
R379
R383
R382
R327
R343
R386
R372
TP51
TP63
TP66
TP64
TP53
TP37
TP39
TP65
TP62
IF level sum adjust of LLZ CRS Posn. output signal
IF level adjust of CSB for CRS Width signal path (CSB+SBO)
IF level adjust of LLZ CRS Width signal path
IF level adjust of CSB for CRS Width signal path (CSB+SBO)
IF level adjust of LLZ CRS Width output signal
IF level sum adjust of LLZ CRS Width output signal
LLZ−2F only:
IF level adjust of CLR Width (2) output signal
LLZ−2F only:
IF level adjust of CLR Width (1) output signal
not used in LLZ
not used in LLZ
−
w. LPD antenna
w. Dip./Reflect.
w. LPD antenna
w. Dip./Reflect.
w. LPD antenna
not used
−
−
J10
J9
J8
J7
J4
J1
J3
J5
J2
J47
J6
J17
J18
J16
J12
J13
J15
J14
J11
J20
J21
R485
TP65
TP59
TP63
TP64
TP15
TP17
TP16
TP11
TP12
TP9
TP8
TP3
TP4
TP56
TP74 TP76 TP72
TP41
TP77 TP75 TP73 TP51
TP57
TP58
TP55
TP29 TP26
TP27
TP31
TP21
TP23
TP20
TP53
TP47 TP49 TP37
TP39 TP34
TP30
TP67
TP69
TP70
TP68
TP71
GND
GND
JP41
JP43
1 2
R275
R286
R327
R345
R343
R353
R240
R217
R318
R305
R312
TP24
TP25
TP22
TP19
R133
R105
R90
R62
R43
R2
R511 R25
R382
R372
R383
R189
R185
R386
R379
R377
R166
R150
R146
R123
R136
R499
R524
TP62
TP66
TP60
TP61
TP18
TP14
TP13
TP10
TP7
TP6
TP2
TP1
TP5
NFM
CRS Posn.
CRS Width
CRS CSB
Stby
CRS SBO
Stby
CRS Width (1)
CLR SBO
Stby
CLR CSB
Stby
RFcwCLR TX1
RFcwCRS TX1
RFcwCRS TX2
RFcwCLR TX2
* LLZ with LPD−antenna
CRS CSB*
CRS SBO*
Fig. 3−3
Stby and On−Air Combiner (SOAC), front view, controls and test points
Summary of Contents for 421
Page 2: ......
Page 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Page 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Page 56: ......
Page 58: ......
Page 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Page 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Page 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Page 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Page 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Page 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Page 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...