
LLZ 421
Operation and Maintenance
Installation
ILS 420
2−13
Ed. 01.04
SOAC
2.4.3
RF−Connections at Transmitter Rack
See Figs. 2−15 to 2−17, 2−21, 2−25, 2−26.
Make the following cable connections (to/from):
Transmitter Rack
Cable (1F) Cable (2F)
Shelter to ADU:
(1F)
(2F)
J8, CRS CSB
W54
W54
W104
W104
J1, CRS SBO
W55
W55
W105
W105
J9, CLR CSB
−
W56
−
W106
J2, CLR SBO
−
W57
−
W107
Transmitter Rack
Cable (1F) Cable (2F)
Shelter from ADU:
(1F)
(2F)
J25, A1/CRS Path/CSB
W51
W51
W101
W101
J27, A3/CRS Width/SBO W52
W52
W102
W102
J29, CLW1
(Width CLR)
−
W53
−
W103
J28, NFM1
opt.
W58
W58
from nearf. dipole 1
W108
W108
J31, NFM2
opt.
−
−
from nearf. dipole 2
−
−
rear side
rear side
LLZ−1F
LLZ−2F
J8
J1
J2
J9
J4
J5
J10
J12
CRS
CSB
CLR
CSB
CRS
SBO
CLR
SBO
OIO IN
OIO OUT
LGM1
LGM2/DME
COM4/NDB
ENV. SENSORS,DME,DETECTOR IN
PC
J22
J23
J24
J30
J29
(CLW1)
(CLW2)
J31
J28
(NFM1)
(NFM2)
J32
J26
J25
(A1/CRS PATH/CSB)
(A2)
J27
(A3/CRS WIDTH/SBO)
RS−232
(A2)
(A3)
(A1)
J3
AG/MON/ECU/ SPARE I/O
MONITOR RF RETURNS
MODEMS (OPTIONAL)
ANTENNA RF
OPTIONAL CONNECTION
(Punch Here)
J8
J1
J2
J9
J4
J5
J10
J12
CRS
CSB
CLR
CSB
CRS
SBO
CLR
SBO
OIO IN
OIO OUT
LGM1
LGM2/DME
COM4/NDB
PC
J22
J23
J24
J30
J29
(CLW1)
(CLW2)
J31
J28
(NFM1)
(NFM2)
J32
J26
J25
(A1/CRS PATH/CSB)
(A2)
J27
(A3/CRS WIDTH/SBO)
RS−232
(A2)
(A3)
(A1)
J3
AG/MON/ECU/ SPARE I/O
MONITOR RF RETURNS
MODEMS (OPTIONAL)
ANTENNA RF
OPTIONAL CONNECTION
(Punch Here)
ENV. SENSORS,DME,DETECTOR IN
J4
J5
previous version: J5 not rotated
J4
J5
previous version: J5 not rotated
1
13
1
13
1
13
1
13
13
1
13
1
13
13
1
1
13
Fig. 2−15
LLZ transmitter rack, top view, connectors
Ed. 06.07
Summary of Contents for 421
Page 2: ......
Page 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Page 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Page 56: ......
Page 58: ......
Page 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Page 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Page 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Page 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Page 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Page 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Page 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...