E
H
1
M
3
M
2
M
1
H
2
LLZ 421
Installation
Operation and Maintenance
ILS 420
2−34
Ed. 01.10
SOAC
Measurements are performed as shown in the diagram below:
E
=
Installation ground
H
1
=
Auxiliary ground 1
H
2
=
Auxiliary ground 2
M
1
=
Measured value 1
M
2
=
Measured value 2
M
3
=
Measured value 3
Measured value 1:
Resistance between installation ground and auxiliary ground 1
Measured value 2:
Resistance between auxiliary ground 1 and auxiliary ground 2
Measured value 3:
Resistance between installation ground and auxiliary ground 2
When the three measurements have been performed the ground resistance is calculated as follows:
Corr. meas. value 1 + corr. meas. 3 − corr. meas value 2
Ground resistance =
2
The measurement is falsified by the resistance of the 2 test leads. The cross−sectional area of the
test leads should not be less than 1.5 mm
@
in order to ensure an adequate breaking strength. With
this cross−sectional area and an assumed length of 2 x 25 m = 50 m, the falsifying resistance would
be 0.58
This resistance should therefore be measured and deducted from measured values 1, 2
and 3. The measured values corrected in this manner are entered into the above formula.
2.5.7
Earthing System LLZ or GP
The site dependent modifications of the arrangement have been taken from the project engineering
documentation.
The LLZ or GP grounding system consists of ground strips (usually made of aluminium, copper, gal-
vanized iron or stainless stee, round (10 mm
∅
) or flat (30 x 3,5 mm) material. The grounding is laid
down in the earth to and along the LLZ antenna foundation or to the GP antenna foundation, and in
the form of a ring ground around the shelter foundation in the defined depth. The ring ground is
grounded at the corners with additional ground rods.
Summary of Contents for 421
Page 2: ......
Page 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Page 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Page 56: ......
Page 58: ......
Page 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Page 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Page 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Page 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Page 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Page 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Page 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...