LLZ 421
Operation and Maintenance
Table of Contents
ILS 420
XIII
Ed. 01.10
SOAC
LIST OF FIGURES
Fig.−No.
Title
Page
Fig. 1−1
LLZ in 10 ft container shelter for all types of transport
1−1
. . . . . . . . . . . . . . . . . . .
Fig. 1−2
LLZ with packing for rail or road transport
1−1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 1−3
Packing for rail and road transport
1−2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−1
Typical installation site with site survey control points
2−1
. . . . . . . . . . . . . . . . . . .
Fig. 2−2
Standard foundation for Shelter (10 ft) and cable trench example
2−2
. . . . . . . . .
Fig. 2−3
Correct lifting with a lifting harness
2−3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−4
10 ft container shelter, dimensions
2−4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−5
10 ft container shelter, outer details
2−4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−6
10 ft container shelter, inner details
2−5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−7
Standard shelter, electrical installation LLZ (example)
2−6
. . . . . . . . . . . . . . . . . . .
Fig. 2−8
AF−distribution box
2−6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−9
Mains distribution box in the shelter
2−7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−10
Battery fuse box
2−8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−11
Emergency battery set
2−8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−12
Cable connections with collocated DME and RL equipment
2−10
. . . . . . . . . . . . . .
Fig. 2−13
Connections at the backpanel BP−PS, C−bar and bottom plate
2−11
. . . . . . . . .
Fig. 2−14
Cabling, BCPS connection plate, C−bar and bottom plate
2−12
. . . . . . . . . . . . . . .
Fig. 2−15
LLZ transmitter rack, top view, connectors
2−13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−16
RF cabling LLZ1F/2F
2−14
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−17
RF−cable passing to shelter cabling (example 2F for standard shelter)
2−15
. . . .
Fig. 2−18
External wiring of auxiliary OIO connections of LCP
2−20
. . . . . . . . . . . . . . . . . . . . .
Fig. 2−19
Assignment of connecting detector signals at J10 on top
2−21
. . . . . . . . . . . . . . . .
Fig. 2−20
Standard shelter, AF distribution box inside (standard)
2−21
. . . . . . . . . . . . . . . . . .
Fig. 2−21
Recommended assignment of terminals in AF distribution box
2−22
. . . . . . . . . . .
Fig. 2−22
Interface connections and back panel connector locations
2−23
. . . . . . . . . . . . . .
Fig. 2−23
RF−cabling transmitter rack (example LLZ−1F), without SYN RF cabling
2−24
. .
Fig. 2−24
RF−cabling transmitter rack (example LLZ−2F), without SYN RF cabling
2−25
. .
Fig. 2−25
System cabling LLZ−1F
2−27
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−26
System cabling LLZ−2F
2−29
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−27
Different types of ground conductor configuration
2−31
. . . . . . . . . . . . . . . . . . . . . .
Fig. 2−28
Example of ground of a Localizer installation
2−33
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Fig. 2−29
Ring earth and earth connection of shelter (example LLZ)
2−33
. . . . . . . . . . . . . . .
Fig. 2−30
Interface Assignment of LGM2/DME and ENV. SENSORS, DME,
2−36
. . . . . . . . .
DETECTOR IN
Summary of Contents for 421
Page 2: ......
Page 26: ...LLZ 421 General Operation and Maintenance ILS 420 1 6 Ed 01 04 SOAC ...
Page 54: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 26 Ed 01 04 SOAC Ed 01 10 ...
Page 56: ......
Page 58: ......
Page 66: ...LLZ 421 Installation Operation and Maintenance ILS 420 2 38 Ed 01 10 SOAC ...
Page 90: ...LLZ 421 Operation Operation and Maintenance ILS 420 3 24 Ed 01 10 SOAC ...
Page 148: ...LLZ GP Maintenance Operation and Maintenance ILS 420 TEST DATA SHEET 6 8 Ed 01 10 SOAC ...
Page 156: ...LLZ 421 Maintenance Operation and Maintenance ILS 420 6 14 Ed 01 10 SOAC ...
Page 216: ...LLZ 421 Alignment Procedure LLZ 1F LPD Operation and Maintenance ILS 420 7 8 Ed 07 08 SOAC ...
Page 238: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 8 Ed 07 08 SOAC ...
Page 256: ...LLZ 421 Alignment Procedure LLZ 2F LPD Operation and Maintenance ILS 420 8 26 Ed 07 08 SOAC ...