Terry Melody 1 - Installation Instructions - ED01050g
47
XB00223
Page 9 of 14
AUTHOR: MK
29/04/2010
Terry Group Internet > Production > Bulletins
10.
Finally fit the gate post side blanking plates found in the fixing kit (LS38966) using the
plate/gland kit (LS38941) for the wire outlet side.
The gland provided is a 25mm gland and therefore requires 25mm conduit rather than the
standard 20mm
A second blanking plate is provided in the event that conduit as been pre fitted between the
gate posts.
When the gate and lift are completely assembled, finaly lay the (LT03041) anti slip tape
provided over the middle set of plinth fixings, ideally achieving an equal spacing between the
pre fitted strip and the rear edge of the plinth.
LT03041 – Anti Slip Tape
Summary of Contents for Melody 1
Page 1: ...Installation Manual Melody 1 Platform Lift Ref ED01050g Date 03 04 2012 Original instructions...
Page 18: ...Terry Melody 1 Installation Instructions ED01050g 18...
Page 20: ...Terry Melody 1 Installation Instructions ED01050g 20...
Page 22: ...Terry Melody 1 Installation Instructions ED01050g 22...
Page 26: ...Terry Melody 1 Installation Instructions ED01050g 26...
Page 28: ...Terry Melody 1 Installation Instructions ED01050g 28...
Page 34: ...Terry Melody 1 Installation Instructions ED01050g 34...
Page 36: ...Terry Melody 1 Installation Instructions ED01050g 36...
Page 60: ...Terry Melody 1 Installation Instructions ED01050g 60...
Page 66: ...Terry Melody 1 Installation Instructions ED01050g 66...