Terry Melody 1 - Installation Instructions - ED01050g
54
XB00198 B Page 2 of 5
AUTHOR: MK 13/05/2010
Terry Group Intranet > Production > Bulletins
Installation Instructions
1.
When the lift is positioned, place the template* in position on the left or right of the scissor
frame. Please follow the instructions on the template are and drill four location holes (drill for
fixing kit CF210 provided) for the control post.
*Paper template provided with instructions.
2.
Feed the cable from the scissors through the cable guards on the ramp mounting and into
the call post, checking the required length and position before proceeding.
Fix the ramp to the base frame as shown with the M6 x 16 CSK screws and fasteners
provided with the Ramp Fixing Kit (LS38778).
Fix the call post in the required position with the coach crews and Rawl plugs provided
(CF210) in the Call Post Fixing Kit (LS38770).
Drilling Locations
Summary of Contents for Melody 1
Page 1: ...Installation Manual Melody 1 Platform Lift Ref ED01050g Date 03 04 2012 Original instructions...
Page 18: ...Terry Melody 1 Installation Instructions ED01050g 18...
Page 20: ...Terry Melody 1 Installation Instructions ED01050g 20...
Page 22: ...Terry Melody 1 Installation Instructions ED01050g 22...
Page 26: ...Terry Melody 1 Installation Instructions ED01050g 26...
Page 28: ...Terry Melody 1 Installation Instructions ED01050g 28...
Page 34: ...Terry Melody 1 Installation Instructions ED01050g 34...
Page 36: ...Terry Melody 1 Installation Instructions ED01050g 36...
Page 60: ...Terry Melody 1 Installation Instructions ED01050g 60...
Page 66: ...Terry Melody 1 Installation Instructions ED01050g 66...