Terry Melody 1 - Installation Instructions - ED01050g
46
XB00223
Page 8 of 14
AUTHOR: MK
29/04/2010
Terry Group Internet > Production > Bulletins
8.
Cut the back board to height and place within the gate posts plinth and floor resting on the
back board angle. Drill and tap M6 through the board into the angle for (CZ106) M6x16
Stainless CSK screws from the common fixing kit (LS38561).
Notch if
required
9.
Attach the call station plate assembly (if not
fitted already) (LT04770 for Melody LS38013 for
TSL) using the M4 security screw provided.
Cap the gate posts with the plastic blanking plugs
(CP147).
IMPORTANT:
If running cabling from lift to gate,
directly through aluminium back board, the
backboard must be notched neatly at the bottom
centre to allow the black flexible conduit to run
through it from the centre rear of the lift.
Summary of Contents for Melody 1
Page 1: ...Installation Manual Melody 1 Platform Lift Ref ED01050g Date 03 04 2012 Original instructions...
Page 18: ...Terry Melody 1 Installation Instructions ED01050g 18...
Page 20: ...Terry Melody 1 Installation Instructions ED01050g 20...
Page 22: ...Terry Melody 1 Installation Instructions ED01050g 22...
Page 26: ...Terry Melody 1 Installation Instructions ED01050g 26...
Page 28: ...Terry Melody 1 Installation Instructions ED01050g 28...
Page 34: ...Terry Melody 1 Installation Instructions ED01050g 34...
Page 36: ...Terry Melody 1 Installation Instructions ED01050g 36...
Page 60: ...Terry Melody 1 Installation Instructions ED01050g 60...
Page 66: ...Terry Melody 1 Installation Instructions ED01050g 66...