
Terry Melody 1 - Installation Instructions - ED01050g
55
XB00198 B Page 3 of 5
AUTHOR: MK 13/05/2010
Terry Group Intranet > Production > Bulletins
3.
Once the lower post is fixed into position, connect the cable from lift using the connector
blocks to the cable from the articulated head. Insert the articulated head into the top of the
post in the required orientation. When satisfied with a tight and square fit, drill a 3.5mm hole
through the fastening tab using the existing hole in the post as a guide. When the hole is
drilled secure the post using the M4 x 10 ST. CSK Tap-Tite Screw (CZ149) provided in the
Call Post Kit (LS38825 - Painted or LS38823 - Stainless).
Drill 3.5mm
Summary of Contents for Melody 1
Page 1: ...Installation Manual Melody 1 Platform Lift Ref ED01050g Date 03 04 2012 Original instructions...
Page 18: ...Terry Melody 1 Installation Instructions ED01050g 18...
Page 20: ...Terry Melody 1 Installation Instructions ED01050g 20...
Page 22: ...Terry Melody 1 Installation Instructions ED01050g 22...
Page 26: ...Terry Melody 1 Installation Instructions ED01050g 26...
Page 28: ...Terry Melody 1 Installation Instructions ED01050g 28...
Page 34: ...Terry Melody 1 Installation Instructions ED01050g 34...
Page 36: ...Terry Melody 1 Installation Instructions ED01050g 36...
Page 60: ...Terry Melody 1 Installation Instructions ED01050g 60...
Page 66: ...Terry Melody 1 Installation Instructions ED01050g 66...