
Terry Melody 1 - Installation Instructions - ED01050g
7
ref: ED01052b, dated: 10/01/2012
• Cut off the 4 pin connector from the other
end of the gate cable, ensuring numbers are
present on the cable stubs for reference later.
• Insert the sleeved grommet from the fixing
kit into the hole on the hinge side in the
barley seed floor.
• Thread the cable through the grommet,
underneath the platform and up thorugh the
large hole in the platform which leads into
the powerpack housing. Ensure the pre-
fitted cable spring sleeve remains in place
on the cable. Reconnect the 4 pin connector,
following the stub wire numbering.
• Plug the connector into the designated
sockets in the main powerpack wiring loom - see wiring diagram for
reference.
16. Connect connector block from car station to 16 way connector block and
carriage gate latch as per page 25
NOTES
Summary of Contents for Melody 1
Page 1: ...Installation Manual Melody 1 Platform Lift Ref ED01050g Date 03 04 2012 Original instructions...
Page 18: ...Terry Melody 1 Installation Instructions ED01050g 18...
Page 20: ...Terry Melody 1 Installation Instructions ED01050g 20...
Page 22: ...Terry Melody 1 Installation Instructions ED01050g 22...
Page 26: ...Terry Melody 1 Installation Instructions ED01050g 26...
Page 28: ...Terry Melody 1 Installation Instructions ED01050g 28...
Page 34: ...Terry Melody 1 Installation Instructions ED01050g 34...
Page 36: ...Terry Melody 1 Installation Instructions ED01050g 36...
Page 60: ...Terry Melody 1 Installation Instructions ED01050g 60...
Page 66: ...Terry Melody 1 Installation Instructions ED01050g 66...