This chapter describes general operation of the Cyber Hardened IBUC
2
, IBUC
2e
,
IBUC
2
G
, IBUC
R
and IBUC
G
.
Introduction
After the Cyber Hardened IBUC has been mounted and connections verified, the
antenna must be aimed towards the appropriate satellite. Follow the antenna
manufacturer’s instructions, using the coordinates (azimuth, elevation, and polarity)
provided by the satellite operator. Do not transmit until you have received
authorization—including a transmit power level—from the satellite network
operations center (NOC) staff.
Start-up Checklist
The IBUC leaves the factory preconfigured for operation; however, you can fine
-
tune
its settings for your particular needs.
Prior to start up, verify the following:
• Transmit/Receive frequencies
All transmit and receive frequencies are set using the modem. Follow the modem
manufacturer’s instruction.
• Cable connections
Ensure that all of the external cables between the IBUC and other equipment are
seated correctly and that there are no breaks or cracks, no sharp bends, pinch
points nor flattened sections in the cables.
• Power
Ensure that the IBUC is receiving power, Power can come via the modem, an
external power supply, or from AC mains.
Summary of Contents for IBUC 2
Page 6: ...iv Engineered to Endure Appendix F Glossary Glossary of Terms F 1 ...
Page 8: ...vi Engineered to Endure ...
Page 12: ...4 Engineered to Endure ...
Page 46: ...System Components 2 26 Engineered to Endure Figure 2 10 DC Power IBUC System Configuration ...
Page 57: ...General Requirements 3 9 Engineered to Endure Figure 3 2 IBUC 2 Field Installation ...
Page 196: ...I n d e x 4 ...