General Requirements
|
3-5
Engineered to Endure
Power Requirements
For DC
-
powered IBUC models with a rated power level of 25 watts or below for
C
-
band, 20 watts and below for X
-
band, 16 watts and below for Ku
-
band and 10 watts
and below for Ka
-
band, the power for the IBUC can come either from the IFL supplied
from the Terrasat indoor unit (IDU) equipped with a 200 watts power supply or from a
satellite modem equipped with a suitable power supply. DC power for these lower
power IBUCs can also be supplied directly through the external power connector (J3)
by using the Terrasat 250 watts external power supply. Refer to the part number label
(shown in
) to determine voltage requirements. Ensure that
24 VDC input voltage is from 20 VDC to 28 VDC and that the 48 VDC input is from
37 VDC to 60 VDC.
Note:
Power for the IBUC
2e
comes only via coaxial cable. Refer to the datasheet in
Appendix D, Component Specifications and Reference Drawings
for power
requirements.
Outdoor Power Supply
Terrasat offers four models of outdoor power supplies. DC
-
powered IBUCs with a
rated power level higher than 25 watts C
-
band, 25 watts X
-
band or 16 watts Ku
-
band
require a separate power supply. Units that get their power from the earth (or telecom)
station do not require an external power supply.
supply models and applications for each. Power supplies have an autoranging AC
front end that works with both 115 VAC and 230 VAC.
Note:
The IBUC is configured at the factory to be floating. Ensure that the correct polarity is
applied to any unit.
!
WARNING
Installation and connection to the line power supply must be made in
compliance with applicable wiring codes and regulations.
Summary of Contents for IBUC 2
Page 6: ...iv Engineered to Endure Appendix F Glossary Glossary of Terms F 1 ...
Page 8: ...vi Engineered to Endure ...
Page 12: ...4 Engineered to Endure ...
Page 46: ...System Components 2 26 Engineered to Endure Figure 2 10 DC Power IBUC System Configuration ...
Page 57: ...General Requirements 3 9 Engineered to Endure Figure 3 2 IBUC 2 Field Installation ...
Page 196: ...I n d e x 4 ...