![Tektronix 80A00 Technical Reference Download Page 33](http://html1.mh-extra.com/html/tektronix/80a00/80a00_technical-reference_1077946033.webp)
Performance Tests
Performance Tests
This chapter contains performance veri
fi
cation procedures for the speci
fi
cations
marked with the
symbol. The equipment listed in the following table, or a
suitable equivalent, is required to complete these procedures.
The procedures are arranged in sections:
Main Instrument (includes 82A04 Phase Reference Module)
Electrical Sampling Modules
Optical Sampling Modules
80A02 EOS/ESD Protection Module
80A05 Electrical Clock Recovery Module
They check all the characteristics that are designated as checked in
Speci
fi
cations.
To check a system consisting of a main instrument and its modules:
Perform the performance test procedures for the main instrument and then
the installed modules.
To check a main instrument as an independent product:
Do the main instrument tests using a two-channel 80E02, 80E03, 80E04,
80E07B, 80E08B, 80E09B, or 80E10B module that has passed the tests in
80E00 Electrical Sampling Modules
.) When performing the time interval accuracy and external direct
trigger delay jitter tests, check one channel of each small-module slot.
In addition, to con
fi
rm that a main instrument can properly compensate all
channels in all modules in all main instrument slots, do the
DC Voltage
Measurement Accuracy
using the tested two-channel 80E00-series module.
DC Voltage Measurement Accuracy
.) Perform this check for
each channel of each small-module slot.
Be sure to run the instrument compensation routine with the tested module
installed each time you move the module to a new slot.
DSA8300 Performance Veri
fi
cation
15
Summary of Contents for 80A00
Page 2: ......
Page 6: ......
Page 16: ...Important safety information x DSA8300 Performance Verification ...