![Tektronix 80A00 Technical Reference Download Page 22](http://html1.mh-extra.com/html/tektronix/80a00/80a00_technical-reference_1077946022.webp)
Functional Test Procedures
Equipment required
For sampling modules:
50
Ω
terminations on all electrical module channels (Tektronix
part number 015-1022-xx).
Dust covers on all optical module channels.
The sampling modules ship from Tektronix with the proper
terminations and dust covers installed.
Prerequisites
Install all sampling modules you plan to use for your
measurements: see module user manual for installation
instructions and ESD handling procedures.
Power on the instrument and wait 20 minutes (warm-up period)
before doing this procedure.
CAUTION.
Electrostatic discharge (ESD) can damage sampling module inputs
and outputs. Always store and transport modules in a static-free container, with
their supplied terminations installed. Do not transport or ship the instrument with
the modules installed in the instrument compartments.
Always use a safely-grounded wrist strap (provided with your instrument) when
installing modules in the mainframe, handling modules, or making connections.
Discharge cables to ground before attaching them to modules.
Compensate the
Mainframe
1.
Select
Utilities > Compensation
.
The Compensation dialog box lists the main instrument and sampling
modules. The temperature change from the last compensation is also listed as
shown in the following
fi
gure.
2.
Wait until the Status for all items to compensate changes from
Warm Up
to
Pass, Fail, or Comp Req'd.
3.
Click
Compensate and Save
(in Select Action area).
4
DSA8300 Performance Veri
fi
cation
Summary of Contents for 80A00
Page 2: ......
Page 6: ......
Page 16: ...Important safety information x DSA8300 Performance Verification ...