Functional Test Procedures
powered on, or power down the instrument and move the module to another
slot). If the module continues to fail, the indicated module may need service.
7.
Click the
Close
button to exit.
End of Mainframe and Module Compensation Procedure
Instrument Functional Tests
These procedures use the DC CALIBRATION OUTPUT and the TDR CLOCK
OUTPUT connectors to further verify that the instrument functions properly. An
SMA cable is required to do these test procedures. The equipment required is
intentionally kept to a minimum.
NOTE.
These procedures verify that the instrument features operate. They do not
verify that they operate within limits; therefore, do not interpret any quantities
cited (such as "about
fi
ve horizontal divisions") as limits.
NOTE.
DO NOT make changes to the front-panel settings that are not called
out in the procedures. Each veri
fi
cation procedure will require you to set the
instrument to default settings before verifying functions. If you make changes to
these settings, other than those called out in the procedure, you may obtain invalid
results. In this case, go back to step 1 and repeat the procedure.
Verify Electrical Input
Channels
Equipment required
One coaxial SMA cable, 50
Ω
, 20 in (0.5 m), male-to-male (item
15)
Prerequisites
One electrical sampling module (80E01, 80E02, 80E03, 80E04,
80E06, 80E07B, 80E08B, 80E09B, or 80E10B)
Figure 1: Setup for electrical functional tests