2.3
POSITIONING
Installation space varies according to the size of the U.P.S and to the battery cabinet. A distance margin from the
walls of the room where the U.P.S. is positioned is also necessary for air circulation and ordinary/extraordinary
maintenance. Please refer to picture 2.3 for minimum margin distances. All models need a distance margin of at least
40cm either side or at least a metre from the ceiling.
2.3.1
CHOOSING THE ROOM
Element Requirements
Room access
•
All the doors which the equipment has to go through in order to reach the chosen room have to
be large enough to allow the passage of the U.P.S (charts 8) and its handling equipment. We
advise you to forbid access to the place where the U.P.S. and its battery cabinets are placed to
all non authorized users.
Room size
•
Room space must be suitable to allow installation of the equipment and periodical and
extraordinary maintenance.
•
When choosing the rooms please remember that the equipment must not be exposed to the
inclemency of the weather, to corrosive substances, to excessive humidity (humidity below 90%
non-condensing) or to very high sources of heat.
•
The environment should not be very dusty. Please be very careful if you decide to carry out any
building work after setting up the machine.
Floor load
•
According to the data in charts 8 you must check that the floors of the chosen rooms can support
the equipment’s weight.
Ventilation
•
Room temperature should be preferably between 15° and 25°C
•
Ventilators expel the heat dissipated by the U.P.S. into the air, therefore the room structure must
be suitable to guarantee sufficient aeration to eliminate the heat produced by the U.P.S.
•
If room temperature does not comply with the recommended parameters or if air circulation in
the room is not adequate, you must supply the room with a ventilation system or, if this should
not be sufficient, install an air conditioning system.
Safety rules
•
The rooms where the U.P.S. is installed must be equipped according to fire and safety
regulations.