174
/
188
12. Disassembly and assembly of vehicle covering parts
Caution:
●The vehicle must be parked on a level and stable
ground or on a lifting platform.
●The operation can only be performed after the engine
and muffler has cooled down completely.
●Attention and sequence when removing the plastic buckle to avoid the buckle from breaking
●The M
125 steps are similar to the M310, taking the M310 as an example.
1. Windshield 2.Right front turn light 3. Right cover front storage box 4. Front right panel 5. Front storage box panel right
decorative cover 6. Right pedal decorative cover 7.Right fuel tank cover plate 8. Right pedal 9. Right side cover 10. Cushion 11.
Tail skirt right part 12. Rear rack 13. Rear mudguard
1. Windshield 2.Left front turn light 3. Left cover front storage box 4. Front left panel 5. Front storage box panel left decorative
cover 6. Left pedal decorative cover 7.Left fuel tank cover plate 8. Left pedal 9. Left side cover 10. Cushion 11. Tail skirt left part
12. Rear rack 13. Rear mudguard
Summary of Contents for ZONTES 310T-M 2022
Page 1: ...1 188 ZT125 310T M Maintenance Manual 2022 09 14 ...
Page 91: ...91 188 l So far the adjustment operation of the valve clearance is completed ...
Page 115: ...115 188 Electrical schematic diagram of EFI system ...
Page 156: ...156 188 Exploded view of front fork components M125 310 Directional exploded view ...
Page 173: ...173 188 ...