Y-4
Y-4
Check (Crane Operation)
11
WY04-05
1
0E
Check (Crane Operation)
1
. Hoisting
[Condition]
• Load
:None
• Engine speed
:650-
1
300 min
-
1
[Procedure]
1
. Shift the boom telescoping lever to full stroke first.
2. Make sure that the main winch moves slowly
while the auxilialy winch lever is slightly operated.
3. Make sure that the main winch does not move
while the auxilialy winch lever is operated to full
stroke.
2. Jib
1
. Make sure that anti-two block function does not
work during the jib set status is registered.
2. Check the jib lock indicator lamp.
• Make sure that the lamp is lit when the jib slides
out of the center support on the boom.
JIB LOCK
Lamp is lit
IWY04-05
1
0E0
1
• After the jib is stowed, make sure that the lamp
is not lit.
3. Detection of contact of the front jack
with ground
1
. Set the crane no outriggers before extending the
front jack.
Stop front jack operation jus before the front jack
touches the ground.
2. Then slightly retract the front jack indicative
symbol on the AML is not hightlight in this
situation.
3. Extended the front jack again.
Continue extending operation for more than 4
seconds after the jack float touches the ground.
Make sure that the front jack indicative symbol on
the AML is hightlighted in this situation.
4. Setup the outrigger emergency
1
. Turn ON the switch of the panel on upper right in
the cab.
2. Confirm the indicator is lighting.
OFF
ON
Indicator
IWY04-05
1
0E02
3. Confirm the extending width can be set manually
with AML regardless of the extending width.
(same to all outriggers)
5. Upper outrigger operation (option):
It becomes possible when
connecting PTO and becoming
the crane work possible.
1
. Confirm an individual operation performs correctly,
and in addition, confirm the following.
• All operation extending: Only four outriggers
operate.
• All operation retracting: Four outriggers and
front jack operate.
2. O/R switch non-neutral position lamp must light if
either Ext./Ret. selection swich or Jack/Slide
selection switch is actuated.
IWY04-05
1
0E03
Lamp is lit
3. After the status of O/R is registered with AML,
confirm the status of AML bocomes on-tire if
retracting O/R or F/J.
Summary of Contents for TT-800XXL1
Page 20: ...B 2 B 2 Hydraulic Pump 3 W101 0280E 1 2 Inside view Variable displacement piston pump...
Page 114: ...5 G 2 G 2 Boom Five Section Boom 5 W536 0760E G 2...
Page 166: ...13 13 W701 0160E K 2 K 2 Air Conditioner K 2 4 Layout 4 1 Overall layout...
Page 167: ...14 14 W701 0160E K 2 K 2 Air Conditioner K 2 4 2 Overall layout...
Page 168: ...15 15 W701 0160E K 2 K 2 Air Conditioner K 2 4 3 Evaporator section...
Page 169: ...16 W701 0160E K 2 K 2 Air Conditioner 5 Compressor ass y...
Page 170: ...17 17 W701 0160E K 2 K 2 Air Conditioner K 2 6 Evaporator ass y...
Page 171: ...18 18 W701 0160E K 2 K 2 Air Conditioner K 2 7 Condenser ass y...
Page 172: ...19 19 W701 0160E K 2 K 2 Air Conditioner K 2 8 Electric 8 1 Electric circuit 0 363 205 60030...
Page 173: ...20 20 W701 0160E K 2 K 2 Air Conditioner K 2 8 2 Main harness A...
Page 174: ...21 21 W701 0160E K 2 K 2 Air Conditioner K 2 8 3 Main harness B...
Page 254: ...Location of Hydraulic Parts 4 WZ07 0780E 4 Z 4 Z 4 Z 4 Location of Hydraulic Parts...
Page 259: ...Hydraulic Electric Carrier Equipment Comparison Table Z 8 Z 8 Z 8 9 WZ09 0130E 9...
Page 263: ...Z 12 Z 12 Harness Boom Z 12 12 WZ04 1310E 12 Harness Boom 1 2 2 343 530 32040 1 343 530 22030...