ii
1
2. Counterweight stowing position detection
switch•
1
(CS24) and switch•2 (CS25)
...................................................... 9
1
3. Front jack full retraction detection switch
(S087) .........................................
1
0
■
Check (Crane Operation)
1
. Hoisting....................................................
11
2. Jib .....................................................
11
3. Detection of contact of the
front jack with ground ...................
11
4. Setup the outrigger emergency................
11
5. Upper outrigger operation (option): It
becomes possible when connecting
PTO and becoming the crane work
possible. .......................................
11
6. Alarms
....................................................
1
2
7. Adjustment procedure of front jack overload
detector switch (S660).................
1
3
■
Adjustment and Checks
1
. Engine speed adjustment procedure.......
1
4
1
.
1
Speed
control ...........................................
1
4
1
.2 Accelerator
pedal .....................................
1
6
1
.3 Engine
speed ...........................................
1
6
2. Adjusting boom telescoping wire ropes...
1
7
■
Oils and Grease Table ............................... 2
1
■
Mass Table ................................................ 22
■
Boom Connecting Pin and Thread Size Table
.................................................... 23
Summary of Contents for TT-800XXL1
Page 20: ...B 2 B 2 Hydraulic Pump 3 W101 0280E 1 2 Inside view Variable displacement piston pump...
Page 114: ...5 G 2 G 2 Boom Five Section Boom 5 W536 0760E G 2...
Page 166: ...13 13 W701 0160E K 2 K 2 Air Conditioner K 2 4 Layout 4 1 Overall layout...
Page 167: ...14 14 W701 0160E K 2 K 2 Air Conditioner K 2 4 2 Overall layout...
Page 168: ...15 15 W701 0160E K 2 K 2 Air Conditioner K 2 4 3 Evaporator section...
Page 169: ...16 W701 0160E K 2 K 2 Air Conditioner 5 Compressor ass y...
Page 170: ...17 17 W701 0160E K 2 K 2 Air Conditioner K 2 6 Evaporator ass y...
Page 171: ...18 18 W701 0160E K 2 K 2 Air Conditioner K 2 7 Condenser ass y...
Page 172: ...19 19 W701 0160E K 2 K 2 Air Conditioner K 2 8 Electric 8 1 Electric circuit 0 363 205 60030...
Page 173: ...20 20 W701 0160E K 2 K 2 Air Conditioner K 2 8 2 Main harness A...
Page 174: ...21 21 W701 0160E K 2 K 2 Air Conditioner K 2 8 3 Main harness B...
Page 254: ...Location of Hydraulic Parts 4 WZ07 0780E 4 Z 4 Z 4 Z 4 Location of Hydraulic Parts...
Page 259: ...Hydraulic Electric Carrier Equipment Comparison Table Z 8 Z 8 Z 8 9 WZ09 0130E 9...
Page 263: ...Z 12 Z 12 Harness Boom Z 12 12 WZ04 1310E 12 Harness Boom 1 2 2 343 530 32040 1 343 530 22030...