12778474-002-2 Revision F – March 2004
TSG-3800 User’s Guide 203
CPU, Frame Generator, and Clock Modules
T1/E1 Frame Generator Module with Clock Bypass
Making Signal Connections
There are no external connections to this module. Signals, data, and power are
connected internally.
Operational Check
Perform the following operational checks after installing the Frame Generator
module in the main shelf. It is assumed that power has been connected to the shelf
and is turned on, and that there is a CPU module installed and functioning properly.
A proper external reference signal must be connected to the corresponding
connector on the rear panel of the main shelf. If used, the fault signal should also be
connected to the main shelf.
1. Verify that the POWER indicator is lit.
2. Verify that the FAULT indicator on the Frame Generator module is off.
Note:
The module indicators may take a few seconds after
installation to reach proper operating status.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com