9-24 ELECTRICAL SYSTEM
• Shift the transmission into the neutral and turn ignition switch
“ON”.
• Crank the engine a few seconds with the starter motor by
depressing starter button and check the CKP sensor peak
voltage.
• Repeat the above test procedure a few times and measure
the highest peak voltage.
Tester knob indication: Voltage (
)
CKP sensor peak voltage: 4.0 V and more
(Green/Yellow – Brown)
If the peak voltage is lower than the standard range, check the
peak voltage at the CKP sensor lead wire coupler.
• Remove the secondary gear case cover. (
8-40)
• Remove the tool box. (
8-41)
• Disconnect the CKP sensor lead wire coupler
2
and connect
the multi circuit tester with the peak volt adaptor.
Blue (
+
Probe) – Green (
-
Probe)
• Measure the CKP sensor peak voltage at the CKP sensor
lead wire coupler.
Tester knob indication: Voltage (
)
CKP sensor peak voltage: 4.0 V and more (Green – Bl)
If the peak voltage is lower than the standard range, check each
coupler at both ends of the circuit or replace the CKP sensor
and inspect it again.
CKP SENSOR RESISTANCE
• Measure the resistance between the lead wires and ground. If
the resistance is not as specified, the CKP sensor must be
replaced.
09900-25008: Multi circuit tester set
Tester knob indication: Resistance (
Ω
)
CKP sensor resistance: 184 – 276
Ω
(Green – Blue)
∞
Ω
(Green – Ground)
CKP sensor
CKP sensor
coupler
G/W
W
ECM
coupler
Peak
volt
adaptor
G/Y
Br
CKP sensor
Peak
volt
adaptor
CKP sensor
coupler
G
Bl
G
Bl
CKP sensor
CKP sensor
coupler
SA
MP
LE
Summary of Contents for Boulevard M50
Page 1: ...VZ800 9 9 5 0 0 3 8 0 5 0 0 1 E...
Page 42: ...2 26 PERIODIC MAINTENANCE SAMPLE...
Page 413: ...SERVICING INFORMATION 10 25 LUBRICATION POINTS 5 3 mm 2 1 in SAMPLE...
Page 414: ...10 26 SERVICING INFORMATION FUEL TANK INSTALLATION 1 Cut after clamping 2 Frame Inside SAMPLE...
Page 418: ...10 30 SERVICING INFORMATION LEFT SIDE COVER INSTALLATION SAMPLE...
Page 453: ...Prepared by December 2004 Part No 99500 38050 01E Printed in Japan 456 SAMPLE...
Page 454: ......