ENGINE 3-13
• Remove the dowel pins and camshaft end cap
3
.
• Rotate the generator rotor 450 degrees (1 and 1/4 turns) and
align the “F I T” line on the generator with the center of the
valve timing inspection hole.
• Remove the cylinder head cover. (Front)
• Remove the dowel pins and camshaft end cap
4
.
CAMSHAFT
• Flatten the lock washer.
• Remove the cam sprocket and camshaft. (Front and rear cyl-
inders)
F
T
SA
MP
LE
Summary of Contents for Boulevard M50
Page 1: ...VZ800 9 9 5 0 0 3 8 0 5 0 0 1 E...
Page 42: ...2 26 PERIODIC MAINTENANCE SAMPLE...
Page 413: ...SERVICING INFORMATION 10 25 LUBRICATION POINTS 5 3 mm 2 1 in SAMPLE...
Page 414: ...10 26 SERVICING INFORMATION FUEL TANK INSTALLATION 1 Cut after clamping 2 Frame Inside SAMPLE...
Page 418: ...10 30 SERVICING INFORMATION LEFT SIDE COVER INSTALLATION SAMPLE...
Page 453: ...Prepared by December 2004 Part No 99500 38050 01E Printed in Japan 456 SAMPLE...
Page 454: ......