
FI SYSTEM 5-11
COMPENSATION OF INJECTION TIME (VOLUME)
The following different signals are output from the respective sensors for compensation of the fuel injection
time (volume).
INJECTION STOP CONTROL
SIGNAL
DESCRIPTION
ENGINE COOLANT TEMPERATURE SEN-
SOR SIGNAL
When engine coolant temperature is low, injection time (vol-
ume) is increased.
INTAKE AIR TEMPERATURE SENSOR
SIGNAL
When intake air temperature is low, injection time (volume)
is increased.
HEATED OXYGEN SENSOR SIGNAL
(FOR E-02, 19, 24)
Air/fuel ratio is compensated to the theoretical ratio from
density of oxygen in exhaust gasses. The compensation
occurs in such a way that more fuel is supplied if detected
air/fuel ratio is lean and less fuel is supplied if it is rich.
BATTERY VOLTAGE SIGNAL
ECM operates on the battery voltage and at the same time,
it monitors the voltage signal for compensation of the fuel
injection time (volume). A longer injection time is needed to
adjust injection volume in the case of low voltage.
ENGINE RPM SIGNAL
At high speed, the injection time (volume) is increased.
STARTING SIGNAL
When starting engine, additional fuel is injected during
cranking engine.
ACCELERATION SIGNAL/
DECELERATION SIGNAL
During acceleration, the fuel injection time (volume) is
increased, in accordance with the throttle opening speed
and engine rpm. During deceleration, the fuel injection time
(volume) is decreased.
SIGNAL
DESCRIPTION
TIP-OVER SENSOR SIGNAL
(FUEL SHUT-OFF)
When the motorcycle tips over, the tip-over sensor sends a
signal to the ECM. Then, this signal cuts OFF current sup-
plied to the fuel pump, fuel injectors and ignition coils.
OVER-REV. LIMITER SIGNAL
The fuel injectors stop operation when engine rpm reaches
rev. limit rpm.
SA
MP
LE
Summary of Contents for Boulevard M50
Page 1: ...VZ800 9 9 5 0 0 3 8 0 5 0 0 1 E...
Page 42: ...2 26 PERIODIC MAINTENANCE SAMPLE...
Page 413: ...SERVICING INFORMATION 10 25 LUBRICATION POINTS 5 3 mm 2 1 in SAMPLE...
Page 414: ...10 26 SERVICING INFORMATION FUEL TANK INSTALLATION 1 Cut after clamping 2 Frame Inside SAMPLE...
Page 418: ...10 30 SERVICING INFORMATION LEFT SIDE COVER INSTALLATION SAMPLE...
Page 453: ...Prepared by December 2004 Part No 99500 38050 01E Printed in Japan 456 SAMPLE...
Page 454: ......