10-32 SERVICING INFORMATION
TAIL LAMP INSTALLATION
*1
*2
*3
*4
Grommet
Clamp
*1
Pass through the tail lamp harness and left turn
signal harness over the right side mounting
boss.
*3
Pass through the wiring harness outside of
cushions.
*2 Assemble to the rear fender.
*4
Pass through the wiring harness between rear
fender and rear brace.
SA
MP
LE
Summary of Contents for Boulevard M50
Page 1: ...VZ800 9 9 5 0 0 3 8 0 5 0 0 1 E...
Page 42: ...2 26 PERIODIC MAINTENANCE SAMPLE...
Page 413: ...SERVICING INFORMATION 10 25 LUBRICATION POINTS 5 3 mm 2 1 in SAMPLE...
Page 414: ...10 26 SERVICING INFORMATION FUEL TANK INSTALLATION 1 Cut after clamping 2 Frame Inside SAMPLE...
Page 418: ...10 30 SERVICING INFORMATION LEFT SIDE COVER INSTALLATION SAMPLE...
Page 453: ...Prepared by December 2004 Part No 99500 38050 01E Printed in Japan 456 SAMPLE...
Page 454: ......