ENGINE 3-81
• Fit the dowel pins and the new gasket
2
.
• Install the front cylinder assembly to the crankcase.
• Connect the water hoses.
• Tighten the cylinder head bolts diagonally to the specified
torque.
Cylinder head bolt (M10):
Initial: 25 N·m (2.5 kgf-m, 18.0 lb-ft)
Final : 38 N·m (3.8 kgf-m, 27.5 lb-ft)
NOTE:
Bolt
A
: 165 mm (6.5 in)
Bolt
B
: 155 mm (6.1 in)
CAMSHAFT
• Position “R I T” mark on the generator rotor with the center of
the valve timing inspection hole.
• Before installing the camshafts onto each cylinder head, apply
SUZUKI MOLY PASTE onto the camshaft journals. Also,
apply engine oil onto the camshaft journal holders.
99000-25140: SUZUKI MOLY PASTE
NOTE:
The camshaft is identified by the embossed letters “F” and “R”.
1
Front cam shaft
2
Rear cam shaft
Use a new gasket to prevent gas leakage.
Pull the cam chains upward, or the chain will be
caught between crankcase and cam drive sprocket.
R
T
R
R
F
F
SA
MP
LE
Summary of Contents for Boulevard M50
Page 1: ...VZ800 9 9 5 0 0 3 8 0 5 0 0 1 E...
Page 42: ...2 26 PERIODIC MAINTENANCE SAMPLE...
Page 413: ...SERVICING INFORMATION 10 25 LUBRICATION POINTS 5 3 mm 2 1 in SAMPLE...
Page 414: ...10 26 SERVICING INFORMATION FUEL TANK INSTALLATION 1 Cut after clamping 2 Frame Inside SAMPLE...
Page 418: ...10 30 SERVICING INFORMATION LEFT SIDE COVER INSTALLATION SAMPLE...
Page 453: ...Prepared by December 2004 Part No 99500 38050 01E Printed in Japan 456 SAMPLE...
Page 454: ......