CHASSIS 8-29
HANDLEBAR HOLDER
• Install the handlebar holders and related parts to the steering
stem head.
• Tighten the handlebar holder nuts to the specified torque.
Handlebar holder nut: 54 N·m (5.4 kgf-m, 39.0 lb-ft)
FRONT FORK AND STEERING STEM UPPER BRACKET
• Install the steering stem upper bracket, washer and steering
stem head nut.
• Install the front forks. (
8-20)
• Tighten the steering stem head nut
1
to the specified torque.
Steering stem head nut
1
: 90 N·m (9.0 kgf-m, 65.0 lb-ft)
NOTE:
Rout the brake hose, throttle cables and handlebar switch lead
wires, before installing the front forks. (
10-15, -18 and -21)
• Speed sensor lead wire routing. (
10-22)
• Install the handlebar. (
8-22 to -23)
• Install the front wheel. (
8-10 to -11)
SA
MP
LE
Summary of Contents for Boulevard M50
Page 1: ...VZ800 9 9 5 0 0 3 8 0 5 0 0 1 E...
Page 42: ...2 26 PERIODIC MAINTENANCE SAMPLE...
Page 413: ...SERVICING INFORMATION 10 25 LUBRICATION POINTS 5 3 mm 2 1 in SAMPLE...
Page 414: ...10 26 SERVICING INFORMATION FUEL TANK INSTALLATION 1 Cut after clamping 2 Frame Inside SAMPLE...
Page 418: ...10 30 SERVICING INFORMATION LEFT SIDE COVER INSTALLATION SAMPLE...
Page 453: ...Prepared by December 2004 Part No 99500 38050 01E Printed in Japan 456 SAMPLE...
Page 454: ......