F-4
SunLink SNA 9.1 PU2.1 Server Configuration Guide—August 1997
F
F.2 sun3770/RJE Clients
The following table lists the Sun PU2.1 SNA Server configuration parameters
specific to sun3770/RJE clients that you must coordinate with the host
configuration. If you change any of these parameters in one configuration, you
must make the corresponding changes in the other configuration.
The NCP/VTAM gen lists all the SNA resources connected to an SNA
communications controller. The LU macro defines the characteristics of the
sun3770/RJE client attached to the corresponding LU port on the Sun PU2.1
SNA Server.
The LU type is determined by parameters that are transferred on the SNA bind
message during session establishment.
The following sample configuration shows the LU definitions for six
sun3770/RJE data streams.
**************************************************
*
* LU MACROS
*
**************************************************
BLU01101
LU
LOCADDR=1,DLOGMOD=BATCH
BLU01102
LU
LOCADDR=2,DLOGMOD=BATCH
BLU01103
LU
LOCADDR=3,DLOGMOD=BATCH
BLU01104
LU
LOCADDR=4,DLOGMOD=BATCH
BLU01105
LU
LOCADDR=5,DLOGMOD=BATCH
BLU01106
LU
LOCADDR=6,DLOGMOD=BATCH
In addition, the VTAM log-on mode (
LOGMODE
) tables require entries describing
the operating characteristics of logical units. The association between the LU
and its
LOGMODE
entry is created in the LU macro of the VTAM/NCP gen or in
the definition of a superior resource: group, line, or PU.
Table F-2 PU2.1 SNA Server 3770/RJE Configuration Parameters
Sun
Resource
Resource
Parameter
Host Object
Host
Parameter
LU
Local Address
LU
LOCADDR
Type
LU
LOGMODE
DLOGMOD
PSERVIC
Summary of Contents for SunLink SNA 9.1 PU2.1
Page 14: ...xiv SunLink SNA 9 1 PU2 1 Server Configuration Guide August 1997...
Page 16: ...xvi SunLink SNA 9 1 PU2 1 Server Configuration Guide August 1997...
Page 18: ...xviii SunLink SNA 9 1 PU2 1 Server Configuration Guide August 1997...
Page 26: ...xxvi SunLink SNA 9 1 PU2 1 Server Configuration Guide August 1997...
Page 48: ...1 22 SunLink SNA 9 1 PU2 1 Server Configuration Guide August 1997 1...
Page 66: ...2 18 SunLink SNA 9 1 PU2 1 Server Configuration Guide August 1997 2...
Page 80: ...3 14 SunLink SNA 9 1 PU2 1 Server Configuration Guide August 1997 3...
Page 110: ...6 12 SunLink SNA 9 1 PU2 1 Server Configuration Guide August 1997 6...
Page 120: ...7 10 SunLink SNA 9 1 PU2 1 Server Configuration Guide August 1997 7...
Page 132: ...8 12 SunLink SNA 9 1 PU2 1 Server Configuration Guide August 1997 8...
Page 226: ...A 10 SunLink SNA 9 1 PU2 1 Server Configuration Guide August 1997 A...
Page 282: ...F 16 SunLink SNA 9 1 PU2 1 Server Configuration Guide August 1997 F...
Page 288: ...G 6 SunLink SNA 9 1 PU2 1 Server Configuration Guide August 1997 G...