
Return To Table of Contents
106
2141-209-002 REV H
www.stryker.com
IR MODULE REMOVAL AND REPLACEMENT - (LITTER) (OPTIONAL)
Tools Required:
• Phillips Screwdriver #2
• Diagonal Pliers
• ESD System
Procedure:
Note: ESD protection is required for this procedure.
1. Plug the bed into a wall outlet.
2. Raise the bed to the full up position.
3. Raise the fowler to the full up position.
4. Unplug the bed power cord from the wall outlet.
5. Turn the battery disconnect switch off.
6. Remove the headboard from the bed.
7. If the optional head end IV pole is present, use a 1/2” socket and 3/8” drive ratchet to remove the IV pole.
8. Using a Phillips screwdriver, remove the six screws that secure the head end frame cover to the head end frame.
9. Remove the head end frame cover and set aside.
10. Using a Phillips screwdriver, remove the two screws that secure the right IR module and gasket to the head end
frame.
Note: Ensure the IR module cable is routed in the wire track before reinstallation.
11. Using a Phillips screwdriver, remove the two screws that secure the left IR module and gasket to the head end
frame.
12. Using diagonal pliers, cut the cable tie that secures the IR module cables below the head end frame.
13. Disconnect the right IR module cable from connector J5 on the headwall communication board.
14. Disconnect the left IR module cable from connector J2 on the headwall communication board.
15. Reverse the procedure to install the new IR modules.
Note: Route both right and left IR module cables into the head end frame through the matching right and left
Zoom
®
handle cable cutouts in the head end frame.
16. Test all bed functionality before returning the bed to service.
He
ad
Fo
ot
Head End Frame
Right IR Module
Gasket
Headwall
Communication
Board
Service Information