Reference
A-22
Applications Manual
10MAY01
Material Handling for E20 Elastomer
1.
Do not open the sealed bag until you are ready to load the
elastomer.
2.
Do not leave the spool in an open environment.
3.
Store unwrapped E20 and E20R material that is not in use in a
dry box with desiccant.
Finishing Parts Built Using Elastomer
1.
Supports are removed by tearing them away from the part.
This can be done by hand or with tools such as small chisels or
pliers.
2.
Supports are easier to remove when the part is warm.
3.
The surface finish can be smoothed using standard files and
sandpaper. Coarser grits are recommended.
4.
Gaps can be filled and surface finish improved by carefully
applying heat with a hot knife to melt filament into a part, then
sanding the surface smooth.
Summary of Contents for FDM 2000
Page 1: ...Introduction FDM 2000 3000 8000 Release 2 0 Stratasys Document no 105208 0001 Rev B...
Page 17: ...Contents FDM 2000 3000 8000 Manual 10 MAY 01 F2 3 8000 vi...
Page 105: ...Reference N 2 Notes 10MAY01 Release 1 0 October 1997 5 0 May 2001...
Page 131: ...G 1 Reference Glossary 10MAY01 Release 4 0 Glossary Stratasys Document no 105213 0001 Rev B...