100
Southwestern Industries, Inc.
TRAK
2
OP
M11 Installation, Maintenance, Service, & Part List Manual
takes longer than 1ms to execute. This only seems to happen if “real
-
time” logging is enable on
the slave.
5.11.3.9 Code 521: Check Control I/O
This service launches a separate application which allows the user to check the various inputs
and outputs on the machine. It is mainly used for troubleshooting purposes. The figures below
depicts what some of the screens look like. Our software shuts down once this application is
launched. This application is closed down when you press the X in the upper right hand corner.
The machine must be turned off and back on to launch our TMX software.
The following screen tests the following buttons on the front panel. Pressing the Cycle Go Key
for example will highlight the white box.
The following INPUT screen allows you to check all the inputs on the control. Triggering an
input, by pressing a switch for example, will highlight the corresponding white box.
Summary of Contents for TRAK 2OP M11
Page 6: ...3 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Page 7: ...4 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Page 8: ...5 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Page 12: ...9 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Page 71: ...68 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...