25
Southwestern Industries, Inc.
TRAK
2
OP
M11 Installation, Maintenance, Service, & Part List Manual
3.6 Connections
3.6.1 Air Regulator/Air Pressure Switch/Solenoid Assembly Mounting
This assembly ships separately from the machine and hence needs to be mounted and hooked
back up. Follow the procedure below.
See figure 3.6
1.
Run electrical connection thru right hand opening and pneumatic lines thru left hand opening
2.
Install 1 orange 6 mm air line labeled A into the solenoid labeled A. Install 1 blue 6 mm air
line labeled B into the solenoid labeled B.
3.
Install black 10mm air line into port C
4.
Install wire and shielding into pressure switch and use a zip tie to prevent shielding from
slipping
5.
Install connections on solenoid D & E
3.6.2 Air Connection
Connect the air supply to the quick disconnect coupling to the left of the pressure regulator. The
air supply line should have a minimum of
3/8”
inside diameter. It is recommended that a water
separator or air dryer be installed upstream of the 2 OP air supply. See the pneumatic drawing
27563-1 for where the air is connected to the machine and all other pneumatic information.
Summary of Contents for TRAK 2OP M11
Page 6: ...3 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Page 7: ...4 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Page 8: ...5 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Page 12: ...9 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...
Page 71: ...68 Southwestern Industries Inc TRAK 2 OP M11 Installation Maintenance Service Part List Manual...